As part of the $1.3 billion LAX BradleyWest Expansion project, Miyamoto played a vital role in the design of the enabling projects. These projects needed to be completed before the new Bradley West Gates could start construction. The Miyamoto team evaluated the existing cable trays and designed new temporary emergency egress stairs. Included in the scope was the rerouting of the fire alarm and communication systems into a separate building and the design of a temporary loading dock and bridge for easy removal of trash and replenishment of duty-free merchandise in the Tom Bradley terminal retail shops.
Market Sector
Aviation
Location
Los Angeles, CA
Completion Date
2009
Cost
$1.3 Billion
Size
800,000 SF