Disney California Adventure

Disney California Adventure underwent a massive renovation from 2007 to 2012, bringing new attractions and themes for park
JFC Distribution Center

Miyamoto provided structural engineering for the conversion of this existing 190,000-SF warehouse in Commerce to a food distribution
Good Eggs Tenant Improvement

Miyamoto provided tenant improvement services to an existing tilt-up building owned by a grocery delivery service company. The
Willowbrook/Rosa Parks Station

The Willowbrook/Rosa Parks station has the fourth highest volume of ridership in the metro system with more than
Foothill Transit Irwindale Maintenance & Operations Facilities

For this new bus maintenance and operations facility, Miyamoto used a variety of materials and structural systems to
Caltrans District 7 Operations & Maintenance Replacement Facility

This maintenance and replacement facility is an elegant combination of open-web steel joists, structural steel framing and tilt-up
Advanced Conceptual Engineering phase of the Torrance Transit Park and Ride Regional Terminal

Miyamoto provided structural engineering for the Advanced Conceptual Engineering phase of the Torrance Transit Park and Ride Regional
Gold Coast Transit

Miyamoto International was the structural engineer for this new facility, which included a 17,000-SF administration building; eight-bay, 28,000-SF
The Greek Theatre Seating Terrace Full Renovation

The Greek Theatre, an iconic outdoor concert, performance and events venue in Los Angelesโ Griffith Park, was to
California State University, Los Angeles Corporation Yard and Public Safety Building

This design-build project for the California State University Los Angeles campus consisted of three buildings on two separate