Sandia National Laboratory Air-Cooled Chiller Conversion

Miyamoto International provided mechanical, electrical, plumbing and structural engineering services to replace three existing 350-ton water-cooled chillers with
PG&E Data Center

Our engineers analyzed the central utility plant (CUP) and developed a master plan with shareholders. Additionally, we provided
HumanGood Skilled Nursing Facility

Miyamoto International (formerly ATI Engineers) replaced two indoor cooling towers that had catastrophically failed by causing structural damage
City of Fremont Maintenance Storage Warehouse

The team provided electrical engineering services for a prefabricated metal building of approximately 10,000 square feet, single-story and
Chevron, Building H-LL Global Security Information Center Renovation

The team provided electrical engineering services to convert an existing storage basement into a 24-hour global security infrastructure.