San Diego

3M Manufacturing

3M Manufacturing

Miyamoto International performed ASCE 41-13 seismic risk mitigation cost-benefit analyses to understand the exposure to potential damage, loss and business interruption of 11 manufacturing facilities at four separate sites in Southern California, each with unique business functions. The buildings were primarily concrete tilt-up with panelized wood roofs, deficient anchorage and cross ties. Utilizing our reports and conceptual sketches, the client considered their most crucial assets and related susceptibility to create priorities for the retrofit program. Upon receiving this order of priority, the design team developed detailed structural retrofits to be strategically implemented in a phased sequence to avoid disruptions in production. The team’s ability to collaborate with user groups for a well-coordinated rollout was crucial to project success. Also central to performance were frequent site visits to successfully coordinate existing utilities, equipment and distribution systems and to proactively solve on-site logistics for maintaining uninterrupted operations. The Miyamoto team also managed building department approvals and the validation of cost estimates and bids. 3M Manufacturing Facilities Location: Irvine, Monrovia, Oak Hills and Northridge, CA Year: 2017 Client: 3M, Inc. Cost: $9.4 Million Scale: 11 Buildings on 4 Sites

Team Members

No data was found

Client

3M, Inc.

Year

2017

Scale

11 Buildings on 4 Sites

Location

Irvine, Monrovia, Oak Hills and Northridge, CA

3M Manufacturing

Miyamoto International performed ASCE 41-13 seismic risk mitigation cost-benefit analyses to understand the exposure to potential damage, loss and business interruption of 11 manufacturing facilities at four separate sites in Southern California, each with unique business functions. The buildings were primarily concrete tilt-up with panelized wood roofs, deficient anchorage and cross ties. Utilizing our reports and conceptual sketches, the client considered their most crucial assets and related susceptibility to create priorities for the retrofit program. Upon receiving this order of priority, the design team developed detailed structural retrofits to be strategically implemented in a phased sequence to avoid disruptions in production. The team’s ability to collaborate with user groups for a well-coordinated rollout was crucial to project success. Also central to performance were frequent site visits to successfully coordinate existing utilities, equipment and distribution systems and to proactively solve on-site logistics for maintaining uninterrupted operations. The Miyamoto team also managed building department approvals and the validation of cost estimates and bids. 3M Manufacturing Facilities Location: Irvine, Monrovia, Oak Hills and Northridge, CA Year: 2017 Client: 3M, Inc. Cost: $9.4 Million Scale: 11 Buildings on 4 Sites

Client

3M, Inc.

Year

2017

Scale

11 Buildings on 4 Sites

Location

Irvine, Monrovia, Oak Hills and Northridge, CA

More Projects

Adaptive Reuse

USC Fire Station No. 15 Relocation

Los Angeles, CA

Miyamoto International worked with the USC to provide design consulting services for the relocation of [..]

View Project

Residential, Retrofit

University of California, Riverside Lothian Residence Hall, Seismic Upgrades

Riverside, CA

Miyamoto provided structural engineering design services for the University of California, Riverside Lothian Residence Hall. [..]

View Project

Commercial, High-Rise, Office

Plaza 555

Sacramento, CA

The property at 555 Capitol Mall consists of several structures connected by a 14-story core [..]

View Project

Commercial, Office

Farm Bureau of California Headquarters, River Plaza

Sacramento, CA

The new headquarters for the California Farm Bureau Federation is a 60,000-SF, 3-story office facility [..]

View Project

Commercial, Residential, Retail

Gio Apartments

Sacramento, CA

Gio Apartments, an infill project at the corner of Stockton & T, is a 5-story [..]

View Project

Sustainability

Dr. Mary McLeod Bethune Exposition Park Regional Branch Library

Los Angeles, CA

Miyamoto International provided structural engineering for this 14,500 SF library located in Exposition Park. The [..]

View Project

Save lives, impact economies.