3M Manufacturing

3M Manufacturing

Miyamoto International performed ASCE 41-13 seismic risk mitigation cost-benefit analyses to understand the exposure to potential damage, loss and business interruption of 11 manufacturing facilities at four separate sites in Southern California, each with unique business functions. The buildings were primarily concrete tilt-up with panelized wood roofs, deficient anchorage and cross ties. Utilizing our reports and conceptual sketches, the client considered their most crucial assets and related susceptibility to create priorities for the retrofit program. Upon receiving this order of priority, the design team developed detailed structural retrofits to be strategically implemented in a phased sequence to avoid disruptions in production. The team’s ability to collaborate with user groups for a well-coordinated rollout was crucial to project success. Also central to performance were frequent site visits to successfully coordinate existing utilities, equipment and distribution systems and to proactively solve on-site logistics for maintaining uninterrupted operations. The Miyamoto team also managed building department approvals and the validation of cost estimates and bids. 3M Manufacturing Facilities Location: Irvine, Monrovia, Oak Hills and Northridge, CA Year: 2017 Client: 3M, Inc. Cost: $9.4 Million Scale: 11 Buildings on 4 Sites

Team Members

No data was found

Client

3M, Inc.

Year

2017

Scale

11 Buildings on 4 Sites

Location

Irvine, Monrovia, Oak Hills and Northridge, CA

3M Manufacturing

Miyamoto International performed ASCE 41-13 seismic risk mitigation cost-benefit analyses to understand the exposure to potential damage, loss and business interruption of 11 manufacturing facilities at four separate sites in Southern California, each with unique business functions. The buildings were primarily concrete tilt-up with panelized wood roofs, deficient anchorage and cross ties. Utilizing our reports and conceptual sketches, the client considered their most crucial assets and related susceptibility to create priorities for the retrofit program. Upon receiving this order of priority, the design team developed detailed structural retrofits to be strategically implemented in a phased sequence to avoid disruptions in production. The team’s ability to collaborate with user groups for a well-coordinated rollout was crucial to project success. Also central to performance were frequent site visits to successfully coordinate existing utilities, equipment and distribution systems and to proactively solve on-site logistics for maintaining uninterrupted operations. The Miyamoto team also managed building department approvals and the validation of cost estimates and bids. 3M Manufacturing Facilities Location: Irvine, Monrovia, Oak Hills and Northridge, CA Year: 2017 Client: 3M, Inc. Cost: $9.4 Million Scale: 11 Buildings on 4 Sites

Client

3M, Inc.

Year

2017

Scale

11 Buildings on 4 Sites

Location

Irvine, Monrovia, Oak Hills and Northridge, CA

More Projects

Commercial

St. Thomas More Sanctuary

Oceanside, CA

Miyamoto International, Inc. provided structural engineering services for the St. Thomas More Sanctuary. The parish [..]

View Project

Education

Casa Roble High School Administration, Student Union and CTE Modernization

Orangevale, CA

This progressive design-build project at Casa Roble High School demolished the existing Administration and Library [..]

View Project

Entertainment

Channel 24 

Sacramento, CA

Located on the southwestern corner of 24th and R streets, Channel 24 is a new [..]

View Project

Lab and Science

The North Medical Office Building and Ambulatory Surgery Center

Yuba City, CA

The North Medical Office Building and Ambulatory Surgery Center, a two-story, 40,000-SF steel-framed structure, is [..]

View Project

Art

The Celestial Globe at the Griffith Observatory

Los Angeles

The Celestial Globe, an art installation marking the 90th anniversary of Griffith Observatory, is the [..]

View Project

Lab and Science

University of California, Irvine, Medical Center Replacement Hospital, Phases 1 and 2

Torrance, CA

Miyamoto provided structural peer review services for the bridging and construction documents of this design-build [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.