Search
Close this search box.
Search
Close this search box.

San Diego

3M Manufacturing

3M Manufacturing

Miyamoto International performed ASCE 41-13 seismic risk mitigation cost-benefit analyses to understand the exposure to potential damage, loss and business interruption of 11 manufacturing facilities at four separate sites in Southern California, each with unique business functions. The buildings were primarily concrete tilt-up with panelized wood roofs, deficient anchorage and cross ties. Utilizing our reports and conceptual sketches, the client considered their most crucial assets and related susceptibility to create priorities for the retrofit program. Upon receiving this order of priority, the design team developed detailed structural retrofits to be strategically implemented in a phased sequence to avoid disruptions in production. The team’s ability to collaborate with user groups for a well-coordinated rollout was crucial to project success. Also central to performance were frequent site visits to successfully coordinate existing utilities, equipment and distribution systems and to proactively solve on-site logistics for maintaining uninterrupted operations. The Miyamoto team also managed building department approvals and the validation of cost estimates and bids. 3M Manufacturing Facilities Location: Irvine, Monrovia, Oak Hills and Northridge, CA Year: 2017 Client: 3M, Inc. Cost: $9.4 Million Scale: 11 Buildings on 4 Sites

Team Members

No data was found

Client

3M, Inc.

Year

2017

Scale

11 Buildings on 4 Sites

Location

Irvine, Monrovia, Oak Hills and Northridge, CA

3M Manufacturing

Miyamoto International performed ASCE 41-13 seismic risk mitigation cost-benefit analyses to understand the exposure to potential damage, loss and business interruption of 11 manufacturing facilities at four separate sites in Southern California, each with unique business functions. The buildings were primarily concrete tilt-up with panelized wood roofs, deficient anchorage and cross ties. Utilizing our reports and conceptual sketches, the client considered their most crucial assets and related susceptibility to create priorities for the retrofit program. Upon receiving this order of priority, the design team developed detailed structural retrofits to be strategically implemented in a phased sequence to avoid disruptions in production. The team’s ability to collaborate with user groups for a well-coordinated rollout was crucial to project success. Also central to performance were frequent site visits to successfully coordinate existing utilities, equipment and distribution systems and to proactively solve on-site logistics for maintaining uninterrupted operations. The Miyamoto team also managed building department approvals and the validation of cost estimates and bids. 3M Manufacturing Facilities Location: Irvine, Monrovia, Oak Hills and Northridge, CA Year: 2017 Client: 3M, Inc. Cost: $9.4 Million Scale: 11 Buildings on 4 Sites

Client

3M, Inc.

Year

2017

Scale

11 Buildings on 4 Sites

Location

Irvine, Monrovia, Oak Hills and Northridge, CA

More Projects

Healthcare

Riverside University Health System Behavioral Health Campus

Mead Valley, CA

The Wellness Village is a medical campus that aims to transform healthcare by integrating behavioral [..]

View Project

Lab and Science

The Gateway Science Museum

Chico, CA

Showcases the natural diversity and geologic history of Northern California. Provides university faculty and students [..]

View Project

U.S. Armed Forces Reserve Center, Fort Allen

Juana Diaz, PR

Miyamoto International served as the structural Quality Control (QC) inspector for this U.S. Armed Forces [..]

View Project

Retail

722 S. Broadway Building Adaptive Reuse

Los Angeles, CA

The 722 S. Broadway Building is an adaptive reuse and seismic upgrade of an existing [..]

View Project

Residential

Ybarra Village

Los Angeles, CA

Miyamoto performed the structural design of the 37,645-SF Ybarra Village, an affordable housing community with [..]

View Project

Lab and Science

California State University, Sacramento Placer Hall

Sacramento, CA

Miyamoto provided structural engineering services for this five-story science classroom building built at a time [..]

View Project

Save lives, impact economies.