400 Oceangate Adaptive Reuse

400 Oceangate Adaptive Reuse

 Currently housing Union Bank, this 15-story, 157,000-SF building from the 1960s is being converted for residential use. The existing structure consists of a pre-cast concrete moment frame system at the perimeter with no interior columns. As the structural engineer, Miyamoto is performing a structural assessment to ensure code compliance in accordance with the building’s change of use. Our design improves the building’s seismic performance by adding fluid viscous dampers along the façade of the building and concrete shear walls in the short direction. This solution ensures code compliance while maximizing the floor area that can be used as net rentable space.  In addition to the Union Bank building, our engineers assisted in determining the feasibility of building a two- to three-story, Type V residential building over the adjacent two-level parking garage. The results showed that it is feasible to convert the garage into a six-story residential building by adding four additional floors to the existing structure. 

Team Members

No data was found

Client

Studio 111

Year

Ongoing

Scale

157,663 SF

Location

Long Beach, CA

400 Oceangate Adaptive Reuse

 Currently housing Union Bank, this 15-story, 157,000-SF building from the 1960s is being converted for residential use. The existing structure consists of a pre-cast concrete moment frame system at the perimeter with no interior columns. As the structural engineer, Miyamoto is performing a structural assessment to ensure code compliance in accordance with the building’s change of use. Our design improves the building’s seismic performance by adding fluid viscous dampers along the façade of the building and concrete shear walls in the short direction. This solution ensures code compliance while maximizing the floor area that can be used as net rentable space.  In addition to the Union Bank building, our engineers assisted in determining the feasibility of building a two- to three-story, Type V residential building over the adjacent two-level parking garage. The results showed that it is feasible to convert the garage into a six-story residential building by adding four additional floors to the existing structure. 

Client

Studio 111

Year

Ongoing

Scale

157,663 SF

Location

Long Beach, CA

More Projects

Civic

Reno City Hall Seismic Retrofit

Reno, NV

Originally built in 1963, the Reno City Hall is a high-rise steel-framed structure. It stands [..]

View Project

Mixed-use, Residential

West Gateway Place

West Sacramento, CA

West Gateway Place, a mixed-use, transit-oriented project in West Sacramento’s Bridge District, was the only [..]

View Project

Industrial

JFC Distribution Center

Commerce, CA

Miyamoto provided structural engineering for the conversion of this existing 190,000-SF warehouse in Commerce to [..]

View Project

Office, Tilt-Up

The Press Sunflower Addition

Costa Mesa, CA

Miyamoto Internati onal provided structural engineering services for the expansion of the Los Angeles Times’ [..]

View Project

Industrial, Marine, Turkey

Yonca Onuk Shipyard

Yonca Onuk Shipyard in Turkey required a detailed assessment and feasibility study for the rehabilitation [..]

View Project

Tilt-Up

California State University, Los Angeles Corporation Yard and Public Safety Building

Los Angeles, CA

This design-build project for the California State University Los Angeles campus consisted of three buildings [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.