6th & Lucas Seismic Retrofit (The Mint)

The seismic retrofit of 6th and Lucas, now called “The Mint,” was an adaptive reuse of an existing 45,000-SF, eight-story concrete building with a basement. Previously used as an outpatient medical center, the building was converted into a 42-unit residential apartment building. This historical structure representing the city’s 1920s Chicago and Beaux-Arts styles was seismically upgraded to the requirements of the 2010 California Building Code and 2011 Los Angeles Building Code.

The seismic retrofit included introducing a combination of new concrete shear walls and coupling beams, a new foundation and strengthening of the existing diaphragm by adding new collector elements. A material-testing program following the comprehensive data collection requirements of ASCE 41 was used to evaluate the existing structural material properties.

One of the main challenges was the discovery of undocumented fill at the site, which required that all new foundation work be based at a minimum of six feet below the existing finished grade elevation. Additionally, the Miyamoto team worked closely with the owner, contractor, soil engineer and building officials to develop shoring designs and drawings to temporarily shore six existing nine-story concrete columns. The temporary shoring allowed the new foundations to underpin existing footings and also be poured in one sequence, which shortened the construction schedule by eight weeks, saving the owner both time and money.

Team Members

No data was found

Client

Holland Construction

Year

2015

Scale

45,000 SF

Location

Los Angeles, California

6th & Lucas Seismic Retrofit (The Mint)

The seismic retrofit of 6th and Lucas, now called “The Mint,” was an adaptive reuse of an existing 45,000-SF, eight-story concrete building with a basement. Previously used as an outpatient medical center, the building was converted into a 42-unit residential apartment building. This historical structure representing the city’s 1920s Chicago and Beaux-Arts styles was seismically upgraded to the requirements of the 2010 California Building Code and 2011 Los Angeles Building Code.

The seismic retrofit included introducing a combination of new concrete shear walls and coupling beams, a new foundation and strengthening of the existing diaphragm by adding new collector elements. A material-testing program following the comprehensive data collection requirements of ASCE 41 was used to evaluate the existing structural material properties.

One of the main challenges was the discovery of undocumented fill at the site, which required that all new foundation work be based at a minimum of six feet below the existing finished grade elevation. Additionally, the Miyamoto team worked closely with the owner, contractor, soil engineer and building officials to develop shoring designs and drawings to temporarily shore six existing nine-story concrete columns. The temporary shoring allowed the new foundations to underpin existing footings and also be poured in one sequence, which shortened the construction schedule by eight weeks, saving the owner both time and money.

Client

Holland Construction

Year

2015

Scale

45,000 SF

Location

Los Angeles, California

More Projects

Parking

California State University Sacramento, Parking Structure I

Sacramento, CA

California State University, Sacramento is primarily a commuter school. With most students living off campus, [..]

View Project

Civic

Domestic Violence Shelter and Resource Center 

Reno, NV

With the mission to address the increasing demand for domestic violence services in the region, [..]

View Project

Retail

Nugget Market

Highland Park Plaza, Roseville, CA

At Nugget Market, nothing is as important as a high-quality product at a low price, [..]

View Project

Retrofit

Carriger Winery

Sonoma, CA

Miyamoto International performed a structural evaluation and developed seismic retrofit design for this historic barn [..]

View Project

Parking, Retail

Nissan-Infinity Parking Structure Downtown LA

Los Angeles, CA

Miyamoto provided the structural design of the Nissan-Infinity Parking Structure, a 10-level, 668,551-SF multi-use building. [..]

View Project

Commercial, Lab and Science

Verily Campus Lab and Office Buildings

South San Francisco, CA

This project involved designing the exterior Buckle Restrained Braced Frame (BRBF) lateral system for two [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.