Puerto Rico

Aguadilla US Army Reserve Training Center

Aguadilla US Army Reserve Training Center

Miyamoto provided structural quality control (QC) inspections as required by the US Army Corps of Engineers. Included in our QC duties was the inspection of wind-and-seismic-resistant main lateral-force-resisting systems and components and cladding. Local contractors faced new challenges as the project incorporated non-standard market methods and materials, such as reinforced concrete used in compliance with high seismic and wind loads, and Insulated Concrete Form (ICF) walls, which are new to the local market. Our detailed structural quality control and technical support to local contractors provided an important bridge between US designers and local contractors to ensure the construction met the specified structural requirements and decreased delays during construction.

Team Members

No data was found

Client

Caribe General Contractors, US Army Corps of Engineers

Year

2020–2022

Scale

29,400 SF

Location

Ramey Naval Base, Aguadilla, PR

Aguadilla US Army Reserve Training Center

Miyamoto provided structural quality control (QC) inspections as required by the US Army Corps of Engineers. Included in our QC duties was the inspection of wind-and-seismic-resistant main lateral-force-resisting systems and components and cladding. Local contractors faced new challenges as the project incorporated non-standard market methods and materials, such as reinforced concrete used in compliance with high seismic and wind loads, and Insulated Concrete Form (ICF) walls, which are new to the local market. Our detailed structural quality control and technical support to local contractors provided an important bridge between US designers and local contractors to ensure the construction met the specified structural requirements and decreased delays during construction.

Client

Caribe General Contractors, US Army Corps of Engineers

Year

2020–2022

Scale

29,400 SF

Location

Ramey Naval Base, Aguadilla, PR

More Projects

Commercial, Entertainment, Retail

Los Angeles Convention Center Expansion

Los Angeles, CA

This multi-purpose facility represents one of the world’s largest convention centers, offering its guests a [..]

View Project

Residential

Hercutech’s Wall Analysis

Tempe, AZ

Hercutech’s Hercuwall technology, an insulated wall panel system, has helped many challenging projects cut back [..]

View Project

Civic

RUHS Behavioral Health, Franklin Residential Care Facility & Behavioral Health Clinic 

Riverside, CA

The Franklin Residential Care Facility & Behavioral Health Clinic, a two-story, tilt-up structure, is the [..]

View Project

Adaptive Reuse

USC Fire Station No. 15 Relocation

Los Angeles, CA

Miyamoto International worked with the USC to provide design consulting services for the relocation of [..]

View Project

Office

The Meier Building

Woodland, CA

The Meier Buildingwas built in 1921 in downtown Woodland’s historic Main Street business district. It [..]

View Project

Commercial, Healthcare, Office, Tilt-Up

Sunnyvale Business Park Medical Office Building

Sunnyvale, CA

Miyamoto International is providing structural engineering services for the Sunnyvale Business Park buildings. The medical office building is [..]

View Project

Save lives, impact economies.