Air Navigation Service Facility and Control Tower at Hamid Karzai International Airport – JICA VII Project

Air Navigation Service Facility and Control Tower at Hamid Karzai International Airport – JICA VII Project

To accommodate the increased arrivals and departures and to enhance security at the Hamid Karzai International Airport (HKIA) in Kabul, a new four-story air navigation facility, including a one-story utility building and control tower, is planned to be constructed. Given the importance of these structures, UNOPS is implementing an international structural review program to supplement the internal review process. Miyamoto led an independent engineering review of the design documents at various phases for the UNOPS compliance check. The project comprised of technical reviews, comments and recommendations of the conceptual, basic and detailed design documents, structural drawings, calculations and models, geotechnical reports, log of borings, geotechnical design parameters, MEP/fire, aviation planning and airport operability, and security considerations in the design of the tower and buildings.

Team Members

No data was found

Client

UNOPS

Year

2022

Scale

-

Location

Kabul, Afghanistan

Air Navigation Service Facility and Control Tower at Hamid Karzai International Airport – JICA VII Project

To accommodate the increased arrivals and departures and to enhance security at the Hamid Karzai International Airport (HKIA) in Kabul, a new four-story air navigation facility, including a one-story utility building and control tower, is planned to be constructed. Given the importance of these structures, UNOPS is implementing an international structural review program to supplement the internal review process. Miyamoto led an independent engineering review of the design documents at various phases for the UNOPS compliance check. The project comprised of technical reviews, comments and recommendations of the conceptual, basic and detailed design documents, structural drawings, calculations and models, geotechnical reports, log of borings, geotechnical design parameters, MEP/fire, aviation planning and airport operability, and security considerations in the design of the tower and buildings.

Client

UNOPS

Year

2022

Scale

-

Location

Kabul, Afghanistan

More Projects

Healthcare

CareMar Recovery Center 

Newport Beach, CA

CareMar Recovery Center is a new, two-story, state-of-the-art facility set to open in 2028 on [..]

View Project

Lab and Science

University of California, Davis Watershed Science Research Center

Davis, CA

This University of California, Davis project is a two-story addition to the Academic Surge. It [..]

View Project

Education

Mira Costa College Oceanside Campus Chemistry & Biotechnology Building

San Diego, CA

A new two-story, 23,300-SF chemistry and biotechnology laboratory building featuring eight total labs (biotech, bioprocessing, [..]

View Project

High-Rise

LinkedIn Headquarters

San Francisco, CA

Recently completed with Gensler, this 26-story offi ce tower is the San Francisco headquarters for [..]

View Project

Civic

Charles Graner Farmhouse

Coloma, CA

The Graner House is a nationally registered historic property at Gold Hill in Coloma, CA. [..]

View Project

Education

CSUS Student Union

Sacramento, California

This three-story expansion to the existing University Union provides an amenity-rich addition and a new [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.