Air Navigation Service Facility and Control Tower at Hamid Karzai International Airport – JICA VII Project

Air Navigation Service Facility and Control Tower at Hamid Karzai International Airport – JICA VII Project

To accommodate the increased arrivals and departures and to enhance security at the Hamid Karzai International Airport (HKIA) in Kabul, a new four-story air navigation facility, including a one-story utility building and control tower, is planned to be constructed. Given the importance of these structures, UNOPS is implementing an international structural review program to supplement the internal review process. Miyamoto led an independent engineering review of the design documents at various phases for the UNOPS compliance check. The project comprised of technical reviews, comments and recommendations of the conceptual, basic and detailed design documents, structural drawings, calculations and models, geotechnical reports, log of borings, geotechnical design parameters, MEP/fire, aviation planning and airport operability, and security considerations in the design of the tower and buildings.

Team Members

No data was found

Client

UNOPS

Year

2022

Scale

-

Location

Kabul, Afghanistan

Air Navigation Service Facility and Control Tower at Hamid Karzai International Airport – JICA VII Project

To accommodate the increased arrivals and departures and to enhance security at the Hamid Karzai International Airport (HKIA) in Kabul, a new four-story air navigation facility, including a one-story utility building and control tower, is planned to be constructed. Given the importance of these structures, UNOPS is implementing an international structural review program to supplement the internal review process. Miyamoto led an independent engineering review of the design documents at various phases for the UNOPS compliance check. The project comprised of technical reviews, comments and recommendations of the conceptual, basic and detailed design documents, structural drawings, calculations and models, geotechnical reports, log of borings, geotechnical design parameters, MEP/fire, aviation planning and airport operability, and security considerations in the design of the tower and buildings.

Client

UNOPS

Year

2022

Scale

-

Location

Kabul, Afghanistan

More Projects

Adaptive Reuse, Civic, Entertainment, Mixed-use, Office, Retail

The Campus @ Horton Plaza

San Diego, CA

The Campus @ Horton Plaza will convert the iconic one-million-SF, five-story, postmodern mall—built in 1985—from [..]

View Project

Healthcare, Sustainability

Sutter Health North Bay Regional Surgery Center Novato

Novato, CA

Miyamoto International has remodeled this existing 3-story office building to become a medical office building [..]

View Project

Religious

 Archdiocese of San Juan

San Juan, PR

In September 2017, Puerto Rico was struck by Hurricane Maria, a devastating category 4 hurricane [..]

View Project

Industrial, Tilt-Up

Otay Logistics Center

Otay Mesa, CA

Otay Logistics Center is a 15-acre site in San Diego consisting of two industrial buildings. [..]

View Project

Commercial

The Shops at Sportsmen’s Lodge

Studio City, CA

The Shops at Sportsmen’s Lodge is the premier destination in the Valley for shopping, dining, [..]

View Project

Healthcare

Sutter Health Radiation Oncology Center

Sacramento, CA

The NPC-4 Evaluation of the Sutter Health Radiation Oncology Center consisted of reviewing as-built documentation [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.