Search
Close this search box.
Search
Close this search box.

All Hands Volunteers School Reconstruction

All Hands Volunteers School Reconstruction

Hundreds of school buildings in the district of Nuwakot, Nepal, were so badly damaged in the 2015 earthquakes that they are unsafe for occupancy. Many months following the earthquake, children continue to study outdoors, in temporary learning centers or – in some cases – in the dangerously damaged buildings.

All Hands Volunteer (AHV), a volunteer-driven US based non-profit organization, has partnered with Nepal’s Department of Education and Miyamoto International Nepal, in order to reconstruct and safely reopen eight school campuses.

On behalf of AHV, Miyamoto conducted the structural assessment of five of the school campuses, which are scattered across the hard-hit Nuwakot district in remote and difficult to reach rural villages. Each of the school campus are made up of four to eight structures of different building types which have sustained various degrees of earthquake-related damage. Miyamoto analyzed the school building stock and engineered repair and retrofit designs for each school building typology. Miyamoto also reviewed the structural plans for the new construction of three campuses and is training AHV’s field engineering teams on construction supervision and quality control on site. Through periodic field visits and spot checks, Miyamoto’s engineers supported AHV’s field teams in ensuring that the school rebuilding program meets international standards for life-safety. Through this program, 1655 number of children are returned to safe school buildings.

Team Members

No data was found

Client

All Hands Volunteers

Year

Est. 2016

Scale

17,468-SF

Location

Nuwakot, Nepal

All Hands Volunteers School Reconstruction

Hundreds of school buildings in the district of Nuwakot, Nepal, were so badly damaged in the 2015 earthquakes that they are unsafe for occupancy. Many months following the earthquake, children continue to study outdoors, in temporary learning centers or – in some cases – in the dangerously damaged buildings.

All Hands Volunteer (AHV), a volunteer-driven US based non-profit organization, has partnered with Nepal’s Department of Education and Miyamoto International Nepal, in order to reconstruct and safely reopen eight school campuses.

On behalf of AHV, Miyamoto conducted the structural assessment of five of the school campuses, which are scattered across the hard-hit Nuwakot district in remote and difficult to reach rural villages. Each of the school campus are made up of four to eight structures of different building types which have sustained various degrees of earthquake-related damage. Miyamoto analyzed the school building stock and engineered repair and retrofit designs for each school building typology. Miyamoto also reviewed the structural plans for the new construction of three campuses and is training AHV’s field engineering teams on construction supervision and quality control on site. Through periodic field visits and spot checks, Miyamoto’s engineers supported AHV’s field teams in ensuring that the school rebuilding program meets international standards for life-safety. Through this program, 1655 number of children are returned to safe school buildings.

Client

All Hands Volunteers

Year

Est. 2016

Scale

17,468-SF

Location

Nuwakot, Nepal

More Projects

Art

Chris Burden “Urban Light”

Los Angeles, CA

The Chris Burden “Urban Light” art installation consists of 202 vintage light posts from Los [..]

View Project

Healthcare

CareMar Recovery Center 

Newport Beach, CA

CareMar Recovery Center is a new, two-story, state-of-the-art facility set to open in 2028 on [..]

View Project

MEP

PG&E Data Center

Fairfield, CA

Our engineers analyzed the central utility plant (CUP) and developed a master plan with shareholders. [..]

View Project

Education

Scripps Ranch High School

San Diego, California

Located within a community known for their eucalyptus forest, the Scripps Ranch High School Project [..]

View Project

DOD/Federal

Aguadilla US Army Reserve Training Center

Ramey Naval Base, Aguadilla, PR

Miyamoto provided structural quality control (QC) inspections as required by the US Army Corps of [..]

View Project

Healthcare, Parking

Sharp Chula Vista Parking Structure

Chula Vista, California

Sharp Chula Vista is calling this project “the parking structure of the future.” The seven-level, [..]

View Project

Save lives, impact economies.