Our engineers’ work on this included preparation of a feasibility study report for the 13.6-km long Ankara Metro Project. The project included the route between the Kizilay-Batikent stations, including cut & cover underground stations, bored twin tunnels and short-span steel bridges.
-
1998
-
Ankara, Turkey
Our engineers’ work on this included preparation of a feasibility study report for the 13.6-km long Ankara Metro Project. The project included the route between the Kizilay-Batikent stations, including cut & cover underground stations, bored twin tunnels and short-span steel bridges.
-
1998
-
Ankara, Turkey
© 2025 Miyamoto International. All Rights Reserved.