Arçelik Electric Owen Facility’s Earthquake Risk Mitigation

Arçelik Electric Owen Facility’s Earthquake Risk Mitigation

The facility was supported by prefabricated cantilever columns and mostly contained robotic manufacturing contents. Approximately 5.000 people worked there in three shifts per day. The client requested to investigate the applicable innovative retrofitting alternatives to prevent business interruption so that production could continue during retrofitting. The scope of services included providing a site-specific seismic hazard analysis report and a high performance earthquake engineering feasibility study by means of energy dissipating seismic devices, cost analysis, planning and budgeting.

Team Members

No data was found

Client

Arçelik

Year

2016

Scale

42,000 m2

Location

Bolu, Turkey

Arçelik Electric Owen Facility’s Earthquake Risk Mitigation

The facility was supported by prefabricated cantilever columns and mostly contained robotic manufacturing contents. Approximately 5.000 people worked there in three shifts per day. The client requested to investigate the applicable innovative retrofitting alternatives to prevent business interruption so that production could continue during retrofitting. The scope of services included providing a site-specific seismic hazard analysis report and a high performance earthquake engineering feasibility study by means of energy dissipating seismic devices, cost analysis, planning and budgeting.

Client

Arçelik

Year

2016

Scale

42,000 m2

Location

Bolu, Turkey

More Projects

Industrial, Marine, Turkey

Yonca Onuk Shipyard

Yonca Onuk Shipyard in Turkey required a detailed assessment and feasibility study for the rehabilitation [..]

View Project

Transportation

Port of San Diego Earthquake Risk Assessment

San Diego, CA

Miyamoto provided a seismic risk assessment of selected Unified Port of San Diego properties located [..]

View Project

Civic

Riverside Municipal Auditorium Retrofit

Los Angeles, CA

The Riverside Municipal Auditorium is a historic 1920s structure. Located in the Mission Inn District [..]

View Project

Healthcare, Tilt-Up

Hale Medical Office Building

Arcadia, CA

Hale Medical Center has an interesting story. Because the Methodist Hospital located in Arcadia, California [..]

View Project

Education

Southwestern College Instructional Complex 1

Chula Vista, CA

The Southwestern College’s Instructional Complex 1 addresses the demand for highly effective general-use instructional space [..]

View Project

Civic

Los Angeles Police Department Harbor Station and Jail

Los Angeles, CA

The LAPD Harbor Station and Jail complex features a new two-story police station and 16,000-sf [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.