Arçelik Refrigerator Facility’s Earthquake Risk Mitigation

Arçelik Refrigerator Facility’s Earthquake Risk Mitigation

The facility was supported by prefabricated cantilever columns and mostly contained robotic manufacturing contents. Approximately 6.000 people worked there in three shifts per day. The client requested to investigate the applicable innovative retrofitting alternatives to prevent business interruption so that production could continue during retrofitting. The scope of services included providing a site-specific seismic hazard analysis report and a high performance earthquake engineering feasibility study by means of energy dissipating seismic devices, cost analysis, planning and budgeting.

Client

Arçelik

Year

2016

Scale

61,000 m2

Location

Eskişehir, Turkey

Arçelik Refrigerator Facility’s Earthquake Risk Mitigation

The facility was supported by prefabricated cantilever columns and mostly contained robotic manufacturing contents. Approximately 6.000 people worked there in three shifts per day. The client requested to investigate the applicable innovative retrofitting alternatives to prevent business interruption so that production could continue during retrofitting. The scope of services included providing a site-specific seismic hazard analysis report and a high performance earthquake engineering feasibility study by means of energy dissipating seismic devices, cost analysis, planning and budgeting.

Client

Arçelik

Year

2016

Scale

61,000 m2

Location

Eskişehir, Turkey

More Projects

Lab and Science

Mercy Oncology Center

Sacramento, CA

Miyamoto International was part of the team that converted this building, previously occupied by the [..]

View Project

MEP

PG&E Data Center

Fairfield, CA

Our engineers analyzed the central utility plant (CUP) and developed a master plan with shareholders. [..]

View Project

Residential

Ybarra Village

Los Angeles, CA

Miyamoto performed the structural design of the 37,645-SF Ybarra Village, an affordable housing community with [..]

View Project

Tilt-UpWarehouse & Distribution

West Corona Industrial Center

Corona, CA

Miyamoto International’s effort on the West Corona Industrial Center was 100 percent during the design [..]

View Project

Lab and Science

Valley Children’s Medical Center

Bakersfield, CA

Miyamoto International provided design-build services for the Medical Office Building at the Valley Children’s Medical [..]

View Project

ResidentialRetrofit

St. Clare at Capitol Park

Sacramento, CA

Originally constructed in 1912, Capitol Park Hotel has served many purposes since its construction, including [..]

View Project

Save lives, impact economies.