Orange County

Brea Medical Office Building

Brea Medical Office Building

Miyamoto International provided structural engineering design services for this four-story, dual lateral system medical office building. The 39,975-SF building is on conventional continuous and isolated concrete pad footings. The bottom story consists of soil retaining structural concrete walls and a covered large vehicle accessible area. The remaining floors contain steel moment frame systems in each direction, with optimal tenant space. Miyamoto International also provided the structural engineering for the exterior finish that surrounds all building sides.

Team Members

No data was found

Client

MSA

Year

2018

Scale

39,975 SF

Location

Brea, CA

Brea Medical Office Building

Miyamoto International provided structural engineering design services for this four-story, dual lateral system medical office building. The 39,975-SF building is on conventional continuous and isolated concrete pad footings. The bottom story consists of soil retaining structural concrete walls and a covered large vehicle accessible area. The remaining floors contain steel moment frame systems in each direction, with optimal tenant space. Miyamoto International also provided the structural engineering for the exterior finish that surrounds all building sides.

Client

MSA

Year

2018

Scale

39,975 SF

Location

Brea, CA

More Projects

International Development

UNDP Northern Haiti Loss Estimation Study

Cap-Haïtien
Môle-Saint-Nicolas
Fort-Liberté Ouanaminthe
Port-de-Paix

For this study, Miyamoto International experts conducted probabilistic seismic risk assessment of four of the [..]

View Project

Entertainment, Retrofit

The Greek Theatre Seating Terrace Full Renovation

Los Angeles, CA

The Greek Theatre, an iconic outdoor concert, performance and events venue in Los Angeles’ Griffith [..]

View Project

Aviation, Civic

Los Angeles International Airport, Police Headquarters

Los Angeles, CA

Miyamoto provided Los Angeles World Airports (LAWA) with a series of options to retrofit the [..]

View Project

Residential

Mather Veterans Village, Phase 1

Mather, CA

Mather Veterans Village, Phase 1 is anaffordable housing project developed by Mercy Housing. Miyamoto provided [..]

View Project

Commercial, Industrial, Tilt-Up, Warehouse & Distribution

Redlands Logistic Center

Redlands, CA

The Redlands Logistic Center is a more than one million square-foot, LEED-Silver facility in Redlands, [..]

View Project

Office

The Meier Building

Woodland, CA

The Meier Buildingwas built in 1921 in downtown Woodland’s historic Main Street business district. It [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.