BTC Pipeline, Ceyhan Onshore Terminal

BTC Pipeline, Ceyhan Onshore Terminal

Regarding this huge onshore terminal, design review services were provided to the contractor before notice to proceed for construction. In the content of the design review, the design documents and the construction drawings of all infrastructure and superstructure systems were reviewed to verify that the design documents and the construction drawings were fully compatible with the related current specifications. The Ceyhan terminal was the end point of the Baku-Tblisi-Ceyhan pipeline situated at the exit point to the Mediterranean Sea functioning as an important loading terminal in transferring crude oil extracted from Azerbaijan’s Caspian Sea to off shore countries. As the related area was a high seismic risk zone and the important factor of safety was highly demanded, the earthquake design had become a serious issue to be taken into account.

Team Members

No data was found

Client

Tekfen Engineering

Year

2002

Scale

-

Location

Ceyhan, Adana, Turkey

BTC Pipeline, Ceyhan Onshore Terminal

Regarding this huge onshore terminal, design review services were provided to the contractor before notice to proceed for construction. In the content of the design review, the design documents and the construction drawings of all infrastructure and superstructure systems were reviewed to verify that the design documents and the construction drawings were fully compatible with the related current specifications. The Ceyhan terminal was the end point of the Baku-Tblisi-Ceyhan pipeline situated at the exit point to the Mediterranean Sea functioning as an important loading terminal in transferring crude oil extracted from Azerbaijan’s Caspian Sea to off shore countries. As the related area was a high seismic risk zone and the important factor of safety was highly demanded, the earthquake design had become a serious issue to be taken into account.

Client

Tekfen Engineering

Year

2002

Scale

-

Location

Ceyhan, Adana, Turkey

More Projects

Residential, Retrofit

St. Clare at Capitol Park

Sacramento, CA

Originally constructed in 1912, Capitol Park Hotel has served many purposes since its construction, including [..]

View Project

Commercial

Pence Art Gallery

Davis, California

This modern structure with its interesting angles and multi-colored exterior accents is an eclectic focal [..]

View Project

Education

Sausalito Marin City School District – Martin Luther King Jr. Academy Nevada Campus

Sausalito, CA

The Martin Luther King Jr. Academy Nevada Campus is a fresh start for the student [..]

View Project

Commercial

Cutwater Distillery

Miramar, California

The new Cutwater Spirits craft distillery, which is believed to be the largest distillery on [..]

View Project

Office

Orange County Transportation Authority Transit Security and Operations Center

Anaheim, CA

Miyamoto is providing structural engineering services for the two-story, 32,000-square-foot OCTA Transit Security and Operati [..]

View Project

Office, Transportation

San Joaquin Regional Transit District (SJRTD) Regional Transportation Center

Stockton, CA

This $45.9 million design-build project consisted of three separate buildings all working together for one [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.