The C3 parking structure is a new 9-level, 1,010-stall high-rise parking structure designed by Miyamoto engineers to serve a new 7-story commercial office building. Due to a very tight site, the structure had to share foundations with an existing 8-level parking structure constructed in the mid-1980s. Though the original structure was designed for a future expansion, changes in building codes and ownership of the different properties demanded creative foundation solutions from Miyamoto. The structure is post-tensioned slabs and long-span Cunningham beams. The office building connects to the parking structure at two levels with 130-foot-span pedestrian bridges that also are seismically supported in the parking structure.
2017 Outstanding Achievement and Excellence in Concrete Construction, Southern California Chapter of American Concrete Institute
KPRS
2017
360,000 SF,
1010 stalls,
9 stories,
2 bridges
Culver City, CA
The C3 parking structure is a new 9-level, 1,010-stall high-rise parking structure designed by Miyamoto engineers to serve a new 7-story commercial office building. Due to a very tight site, the structure had to share foundations with an existing 8-level parking structure constructed in the mid-1980s. Though the original structure was designed for a future expansion, changes in building codes and ownership of the different properties demanded creative foundation solutions from Miyamoto. The structure is post-tensioned slabs and long-span Cunningham beams. The office building connects to the parking structure at two levels with 130-foot-span pedestrian bridges that also are seismically supported in the parking structure.
2017 Outstanding Achievement and Excellence in Concrete Construction, Southern California Chapter of American Concrete Institute
KPRS
2017
360,000 SF,
1010 stalls,
9 stories,
2 bridges
Culver City, CA
© 2025 Miyamoto International. All Rights Reserved.