Search
Close this search box.

Cabaret

The “Haut Damier” residential development in the coastal town of Cabaret, Haiti involved the construction of 156 reinforced-concrete detached homes. Each pastel-painted house was constructed using a proprietary reusable form system. The houses were built as one-story buildings, but were engineered to allow the addition of a second level later.

Families displaced by the 2010 earthquake made up the majority of those selected for the homes; many were living in tent villages before moving into Haut Damier. The houses have two rooms, a bath with shower and kitchen — all in 518 square feet. Residents have created gardens for food and pay $45 a month for five years and then the homes are theirs.

Miyamoto is the Engineer of Record for all of the homes. Miyamoto provided structural engineering and quality-assurance services (for house construction only). The design was per the International Building Code to ensure earthquake and hurricane safety standards.

Client

USAID
CEMEX Haiti

Year

2013

Scale

156 Houses
32 m2 per house

Location

Cabaret, Haiti

Cabaret

The “Haut Damier” residential development in the coastal town of Cabaret, Haiti involved the construction of 156 reinforced-concrete detached homes. Each pastel-painted house was constructed using a proprietary reusable form system. The houses were built as one-story buildings, but were engineered to allow the addition of a second level later.

Families displaced by the 2010 earthquake made up the majority of those selected for the homes; many were living in tent villages before moving into Haut Damier. The houses have two rooms, a bath with shower and kitchen — all in 518 square feet. Residents have created gardens for food and pay $45 a month for five years and then the homes are theirs.

Miyamoto is the Engineer of Record for all of the homes. Miyamoto provided structural engineering and quality-assurance services (for house construction only). The design was per the International Building Code to ensure earthquake and hurricane safety standards.

Client

USAID
CEMEX Haiti

Year

2013

Scale

156 Houses
32 m2 per house

Location

Cabaret, Haiti

More Projects

RetailSustainability

Hot Italian Restaurant

Sacramento, CA

Hot Italian, the ‘green’ pizza and panini restaurant and Italian clothing boutique, is part of [..]

View Project

CommercialEntertainmentRetail

John Reed DTLA

Los Angeles, CA

John Reed Fitness is a revolutionary fitness chain owned by the RSG Group. What makes [..]

View Project

CivicRetrofit

Hollywood Bowl

Los Angeles, CA

The iconic Hollywood Bowl in Los Angeles is known for its band shell, a distinctive set [..]

View Project

OfficeRetail

Pearson’s Building

Woodland, CA

This two-story, unreinforced brick masonry building was built in 1875 on downtown Woodland’s historic Main [..]

View Project

Education

Fairfield-Suisun Unified School District, Public Safety Academy Gym, Locker Room & Library

Fairfield, CA

The Public Safety Academy, the school district’s state-of-the-art facility, is a K-8 campus customized for [..]

View Project

EducationHealthcare

UCSD Health Sciences & Medical Center

San Diego, California

The UCSD Health Sciences & Medical Center was designed to provide office space for doctors [..]

View Project

Save lives, impact economies.