Search
Close this search box.

CalSTRS

CalSTRS

This 15-story offi ce tower rises above two levels of public space along the historic Sacramento River Walk and attained LEED Platinum certifi cation. There is a fi ve level, 306,000-SF parking garage attached to the main tower. The lateral systems used include concrete shearwalls, concrete monument frame, steel eccentric braced frames and steel moment frames. Additionally, precast column and beam system were implemented in the parking levels to hasten the construction and reduce cost. Energy effi cient innovations and sustainable strategies were incorporated into the design to reduce energy use by 17 percent. This was estimated to save the building $1.7 million annually in energy costs. An underfl oor air distribution system helps reduce energy loads throughout the open plan offi ce areas. In order to increase productivity, 90 percent of occupants have access to natural lighting and the workplace features several quality-of-life amenities, including a walkable site that employees can enjoy during the workday.

*Miyamoto Staff Experience

Client

California State Teachers Retirement System,
HOK

Year

2009

Scale

409,000 SF

Location

Sacramento, CA

CalSTRS

This 15-story offi ce tower rises above two levels of public space along the historic Sacramento River Walk and attained LEED Platinum certifi cation. There is a fi ve level, 306,000-SF parking garage attached to the main tower. The lateral systems used include concrete shearwalls, concrete monument frame, steel eccentric braced frames and steel moment frames. Additionally, precast column and beam system were implemented in the parking levels to hasten the construction and reduce cost. Energy effi cient innovations and sustainable strategies were incorporated into the design to reduce energy use by 17 percent. This was estimated to save the building $1.7 million annually in energy costs. An underfl oor air distribution system helps reduce energy loads throughout the open plan offi ce areas. In order to increase productivity, 90 percent of occupants have access to natural lighting and the workplace features several quality-of-life amenities, including a walkable site that employees can enjoy during the workday.

*Miyamoto Staff Experience

Client

California State Teachers Retirement System,
HOK

Year

2009

Scale

409,000 SF

Location

Sacramento, CA

More Projects

High-Rise

Grand Shamaya (Phase 1)

Surabaya, Indonesia

The 150,000 sqm. development is a high specification residential towers in Surabaya, Indonesia. Phase 1 [..]

View Project

CommercialHigh-RiseResidential

Chase Plaza

Kuala Lumpur, Malaysia

Located in the central district of Jakarta, the Chase Plaza is composed of a 29-story [..]

View Project

High-Rise

CalSTRS

Sacramento, CA

This 15-story offi ce tower rises above two levels of public space along the historic [..]

View Project

Retrofit

The Libby Elementary School Modernization

Oceanside, CA

The Libby Elementary School modernization and expansion project required a complete renovation and seismic upgrade [..]

View Project

Miyamoto Protek

Rapid and Sustainable Shelter Solutions that Accelerate the Safe Return Home of Internally Displaced Persons (IDPs) and Early Recovery of Affected Communities

Osmaniye, Turkey

USAID/BHA funded Turkey project, implemented by Miyamoto International, Inc., aims to provide shelter and settlement [..]

View Project

Residential

Mesa Court Housing

Irvine, CA

Miyamoto International held a structural peer review of three new five-story structures over a podium. [..]

View Project

Save lives, impact economies.