Search
Close this search box.

SF Bay Area

Capitol Park Hotel Renovation

Capitol Park Hotel Renovation

Originally constructed in 1915, Capitol Park Hotel has served in recent years as a temporary housing project for the homeless. Now, this eight-story, historic Sacramento hotel is being converted into permanent housing for those transitioning out of homelessness, turning the hotel’s 180 hotel rooms into 134 studio apartments. In addition to living spaces, the project will also create five new commercial spaces on the ground floor of the building.

The seismic retrofit design introduced concrete shear walls on the upper floors behind the historic exterior brick bearing walls in discrete locations to avoid obstructing the historic windows. The design also incorporated concrete moment frame columns and beams in the edges of ground floor retail and second floor assembly spaces to provide adequate strength and stiffness while mitigating any impact on space usage and obstruction of the exterior storefront glazing.

Client

Page & Turnbull

Year

2022

Scale

66,000 SF

Location

Sacramento, CA

Capitol Park Hotel Renovation

Originally constructed in 1915, Capitol Park Hotel has served in recent years as a temporary housing project for the homeless. Now, this eight-story, historic Sacramento hotel is being converted into permanent housing for those transitioning out of homelessness, turning the hotel’s 180 hotel rooms into 134 studio apartments. In addition to living spaces, the project will also create five new commercial spaces on the ground floor of the building.

The seismic retrofit design introduced concrete shear walls on the upper floors behind the historic exterior brick bearing walls in discrete locations to avoid obstructing the historic windows. The design also incorporated concrete moment frame columns and beams in the edges of ground floor retail and second floor assembly spaces to provide adequate strength and stiffness while mitigating any impact on space usage and obstruction of the exterior storefront glazing.

Client

Page & Turnbull

Year

2022

Scale

66,000 SF

Location

Sacramento, CA

More Projects

Residential

Mather Veterans Village, Phase 1

Mather, CA

Mather Veterans Village, Phase 1 is anaffordable housing project developed by Mercy Housing. Miyamoto provided [..]

View Project

Retrofit

The Physical Science Building

Chico, CA

The Physical Science Building contains 179 assigned spaces and 74,227-SF which include teaching, research and [..]

View Project

MEP

Sandia National Laboratory Air-Cooled Chiller Conversion

Livermore, CA

Miyamoto International provided mechanical, electrical, plumbing and structural engineering services to replace three existing 350-ton [..]

View Project

Parking

Sutter Community Parking Structure

Sacramento, CA

This eight-story, 334,000 SF parking structure provides an additional 1,107 public parking spaces to midtown [..]

View Project

DOD/Federal

U.S. Post Office & Federal Building Seismic Rehabilitation

Sacramento, CA

When the Federal Building required rehabilitation to improve its seismic resistance and sustainability over time, [..]

View Project

Parking

California State University Sacramento, Parking Structure I

Sacramento, CA

California State University, Sacramento is primarily a commuter school. With most students living off campus, [..]

View Project

Save lives, impact economies.