This project replaces the Caribbean Market that was lost during the Haiti January 2010 earthquake. Miyamoto analyzed and designed a one-story, partially buried concrete structure with three additional floors of steel structure. The cast-in-place concrete structure, a product warehouse for the adjacent market, functions as storage below grade and a parking garage above. The three-level structure is mixed-use, providing retail and office spaces, and uses a buckling restrained braced frame to resist and dissipate energy during earthquakes. Our engineers ensured that construction went smoothly and without interruption by providing support and on-site directions to the contractor.

Team Members

No data was found

Client

Nihad Al Rayes

Year

Phase I: Warehouse/Parking Structure Completed in 2012; Phase II: Mixed-Use Building in Progress

Scale

5,270 SM (56,700 SF)

Location

Pétionville, Haiti

Caribbean Market

This project replaces the Caribbean Market that was lost during the Haiti January 2010 earthquake. Miyamoto analyzed and designed a one-story, partially buried concrete structure with three additional floors of steel structure. The cast-in-place concrete structure, a product warehouse for the adjacent market, functions as storage below grade and a parking garage above. The three-level structure is mixed-use, providing retail and office spaces, and uses a buckling restrained braced frame to resist and dissipate energy during earthquakes. Our engineers ensured that construction went smoothly and without interruption by providing support and on-site directions to the contractor.

Client

Nihad Al Rayes

Year

Phase I: Warehouse/Parking Structure Completed in 2012; Phase II: Mixed-Use Building in Progress

Scale

5,270 SM (56,700 SF)

Location

Pétionville, Haiti

More Projects

Seismic Retrofit/Heritage Renovation

Elks Tower Seismic Upgrade

Sacramento, CA

The historic Elks Tower was rehabilitated to showcase retail shops on the first floor while [..]

View Project

Healthcare, Office, Tilt-Up

Santa Rosa Medical Office Building

Santa Rosa, CA

Sutter Santa Rosa is a 80,000-SF, three-story concrete tilt-up building on conventional continuous and isolated [..]

View Project

Civic, Retail

Loftworks at 2600 Capitol

Vacaville, CA

2600 Capitol Office Building, also known as the Green Office Building, is a clean, modern [..]

View Project

Office, Retrofit

The Healy Brothers Building

Eureka, CA

The Healy Brothers Building is a three-story, unreinforced masonry building built in 1908 by the [..]

View Project

High-Rise, Residential

DN OxyPark Group Housing

Bhubaneswar

At the DN OxyPark, Miyamoto India provided complete structural design services and post contract services. [..]

View Project

DOD/Federal

Aguadilla US Army Reserve Training Center

Ramey Naval Base, Aguadilla, PR

Miyamoto provided structural quality control (QC) inspections as required by the US Army Corps of [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.