Carson Tahoe Hospital Expansion

Carson Tahoe Hospital Expansion

This Carson Tahoe Hospital project was an especially challenging expansion that encompassed three phases. At the main hospital, the Emergency Department was expanded on both the north and west sides, adding a new canopy drive-through, of approximately 6,500 SF, for the ambulances. The more interesting piece is the subterranean level of the 22,000-SF Research Medical Center (RMC) expansion on the south side of the main hospital. The existing plaza level was removed, and the main hospital had to be underpinned to allow the RMC lab to tuck up alongside the hospital. Now, a new outdoor plaza rests over the RMC Lab with trellises and green space for both patients and staff. 

Previously, the main hospital and the Surgical Center were separated by a creek bed and patients had to be transported by ambulance across the campus for procedures. Now, there is a 4,426-SF, two-story connector bridge with an elevator/ stair tower so staff and patients have access to the Surgical Center on the south end of the campus. This connector also brings mechanical services from the Central Utility Plant north of the main hospital down to the Surgical Center. 

Team Members

No data was found

Client

Boulder Associates

Year

2021

Scale

40,000 SF

Location

Carson City, NV

Carson Tahoe Hospital Expansion

This Carson Tahoe Hospital project was an especially challenging expansion that encompassed three phases. At the main hospital, the Emergency Department was expanded on both the north and west sides, adding a new canopy drive-through, of approximately 6,500 SF, for the ambulances. The more interesting piece is the subterranean level of the 22,000-SF Research Medical Center (RMC) expansion on the south side of the main hospital. The existing plaza level was removed, and the main hospital had to be underpinned to allow the RMC lab to tuck up alongside the hospital. Now, a new outdoor plaza rests over the RMC Lab with trellises and green space for both patients and staff. 

Previously, the main hospital and the Surgical Center were separated by a creek bed and patients had to be transported by ambulance across the campus for procedures. Now, there is a 4,426-SF, two-story connector bridge with an elevator/ stair tower so staff and patients have access to the Surgical Center on the south end of the campus. This connector also brings mechanical services from the Central Utility Plant north of the main hospital down to the Surgical Center. 

Client

Boulder Associates

Year

2021

Scale

40,000 SF

Location

Carson City, NV

More Projects

Office, Retrofit

One Capitol Mall

Sacramento, CA

The beautiful One Capitol Mall, bedecked with marble and bronze, was originally built in 1993. [..]

View Project

Mixed-use, Residential

Riverwalk Mixed Use Phase 1

San Diego, CA

Riverwalk is a 200-acre mixed-use community located in San Diego’s Mission Valley submarket. Set in [..]

View Project

Office, Retrofit

The Healy Brothers Building

Eureka, CA

The Healy Brothers Building is a three-story, unreinforced masonry building built in 1908 by the [..]

View Project

Residential

Falkirk Apartments

Riverside, CA

Miyamoto International conducted structural evaluations on 19 two-story wood residential apartment buildings and several single-story [..]

View Project

Lab and Science

University of California, Irvine, Medical Center Replacement Hospital, Phases 1 and 2

Torrance, CA

Miyamoto provided structural peer review services for the bridging and construction documents of this design-build [..]

View Project

Transportation

The Lowry Ranch Bridge

Redding Rancheria, CA

The Lowry Ranch Bridge is a 300-foot-span, pedestrian/vehicle bridge that will connect the Redding Rancheria [..]

View Project

Save lives, impact economies.