Reno

Carson Tahoe Hospital Expansion

Carson Tahoe Hospital Expansion

This Carson Tahoe Hospital project was an especially challenging expansion that encompassed three phases. At the main hospital, the Emergency Department was expanded on both the north and west sides, adding a new canopy drive-through, of approximately 6,500-SF, for the ambulances. The more interesting piece is the subterranean level of the 22,000-SF Research Medical Center (RMC) expansion on the south side of the main hospital. The existing plaza level was removed, and the main hospital had to be underpinned to allow the RMC lab to tuck up alongside the hospital. Now, a new outdoor plaza rests over the RMC Lab with trellises and greenspace for both patients and staff.

Previously, the main hospital and the Surgical Center were separated by a creek bed and patients had to be transported by ambulance across the campus for procedures. Now, there is a 4,426-SF, two-story connector bridge with an elevator/stair tower so staff and patients have access to the Surgical Center on the south end of the campus. This connector also brings mechanical services from the Central Utility Plant north of the main hospital down to the Surgical Center.

Team Members

No data was found

Client

Boulder Associates

Year

2021

Scale

40,000 SF

Location

Carson City, NV

Carson Tahoe Hospital Expansion

This Carson Tahoe Hospital project was an especially challenging expansion that encompassed three phases. At the main hospital, the Emergency Department was expanded on both the north and west sides, adding a new canopy drive-through, of approximately 6,500-SF, for the ambulances. The more interesting piece is the subterranean level of the 22,000-SF Research Medical Center (RMC) expansion on the south side of the main hospital. The existing plaza level was removed, and the main hospital had to be underpinned to allow the RMC lab to tuck up alongside the hospital. Now, a new outdoor plaza rests over the RMC Lab with trellises and greenspace for both patients and staff.

Previously, the main hospital and the Surgical Center were separated by a creek bed and patients had to be transported by ambulance across the campus for procedures. Now, there is a 4,426-SF, two-story connector bridge with an elevator/stair tower so staff and patients have access to the Surgical Center on the south end of the campus. This connector also brings mechanical services from the Central Utility Plant north of the main hospital down to the Surgical Center.

Client

Boulder Associates

Year

2021

Scale

40,000 SF

Location

Carson City, NV

More Projects

Residential

Hornet Commons

Sacramento, CA

This new student housing village at Sacramento State is an apartment-style community aimed at upper-division [..]

View Project

Civic

Vacaville Police Station

Vacaville, CA

The new two-story, 40,000-SF Vacaville Police Station was the first building in the United States [..]

View Project

Civic

Antelope Valley Courthouse

Lancaster, CA

Highlighted by its unique barrel-shaped, three-story high atrium, the Michael D. Antonovich Courthouse is the [..]

View Project

Office

Shasta Executive Plaza GSA Seismic Assessment

Redding, CA

The existingbuildinghad a steel-framed structure with truss moment frames in each direction, designed per the [..]

View Project

Education

Peralta Community College Master Plan

Oakland, CA
Berkeley, CA
Bay Area, CA

This Master Plan consists of evaluating more than 40 buildings on five campuses within the [..]

View Project

Civic

Corona Police Department HQ

Corona, CA

The project involved a remodel and addition to an existing 72,000-SF building. The primary effort [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.