Reno

Carson Tahoe Hospital Expansion

Carson Tahoe Hospital Expansion

This Carson Tahoe Hospital project was an especially challenging expansion that encompassed three phases. At the main hospital, the Emergency Department was expanded on both the north and west sides, adding a new canopy drive-through, of approximately 6,500-SF, for the ambulances. The more interesting piece is the subterranean level of the 22,000-SF Research Medical Center (RMC) expansion on the south side of the main hospital. The existing plaza level was removed, and the main hospital had to be underpinned to allow the RMC lab to tuck up alongside the hospital. Now, a new outdoor plaza rests over the RMC Lab with trellises and greenspace for both patients and staff.

Previously, the main hospital and the Surgical Center were separated by a creek bed and patients had to be transported by ambulance across the campus for procedures. Now, there is a 4,426-SF, two-story connector bridge with an elevator/stair tower so staff and patients have access to the Surgical Center on the south end of the campus. This connector also brings mechanical services from the Central Utility Plant north of the main hospital down to the Surgical Center.

Team Members

No data was found

Client

Boulder Associates

Year

2021

Scale

40,000 SF

Location

Carson City, NV

Carson Tahoe Hospital Expansion

This Carson Tahoe Hospital project was an especially challenging expansion that encompassed three phases. At the main hospital, the Emergency Department was expanded on both the north and west sides, adding a new canopy drive-through, of approximately 6,500-SF, for the ambulances. The more interesting piece is the subterranean level of the 22,000-SF Research Medical Center (RMC) expansion on the south side of the main hospital. The existing plaza level was removed, and the main hospital had to be underpinned to allow the RMC lab to tuck up alongside the hospital. Now, a new outdoor plaza rests over the RMC Lab with trellises and greenspace for both patients and staff.

Previously, the main hospital and the Surgical Center were separated by a creek bed and patients had to be transported by ambulance across the campus for procedures. Now, there is a 4,426-SF, two-story connector bridge with an elevator/stair tower so staff and patients have access to the Surgical Center on the south end of the campus. This connector also brings mechanical services from the Central Utility Plant north of the main hospital down to the Surgical Center.

Client

Boulder Associates

Year

2021

Scale

40,000 SF

Location

Carson City, NV

More Projects

Healthcare, Lab and Science

Sutter Gould Medical Foundation Modesto

Modesto, CA

Sutter Gould Medical Foundation is a four-story, 132,600 square foot, steel framed structure. This state-of-the-art [..]

View Project

Lab and Science

Mercy Oncology Center

Sacramento, CA

Miyamoto International was part of the team that converted this building, previously occupied by the [..]

View Project

Commercial

Pacific Coast Collection

Oceanside, CA

Pacific Coast Collection is an industrial park consisting of four new, single-story, concrete tilt-up buildings [..]

View Project

Healthcare, Lab and Science, Tilt-Up

Loma Linda University Medical Office Building

San Bernardino, CA

This project is the result of a partnership between Loma Linda University and Social Action [..]

View Project

Civic

Lakeside Library

Lakeside, CA

The Lakeside Branch Library provides space and resources to enhance community engagement and activity. This [..]

View Project

Commercial

Chen Building

Davis, CA

This striking structure in old downtown Davis is a mixture of angles and curves. The [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.