Casa Roble High School Administration, Student Union and CTE Modernization

Casa Roble High School Administration, Student Union and CTE Modernization

This progressive design-build project at Casa Roble High School demolished the existing Administration and Library buildings to create space for a new Administration and Student Union building. The single-story, approximately 17,400-SF steel-framed structure offers an open and flexible use of space for student gatherings and adaptive learning on campus. The semi-rural setting gives the school a unique sense of proximity to urban amenities while feeling as if one were in the countryside. The building itself is very modern with an exposed structure, clerestories, roof offsets and multi-tiered roof framing levels. The lateral force resisting system is steel ordinary concentric braced frames. The administrative one-stop-shop was treated with an angled wall that inverts the dominant mansard roof shapes that reflect the character of the existing campus buildings. In addition, the scope included the modernization of an existing classroom building, transforming it into a Career Technical Education (CTE) building to support health and science programs.

Client

JK Architecture + Engineering Flint Builders, Inc.

Year

2019

Scale

17,400 SF

Location

Orangevale, CA

Casa Roble High School Administration, Student Union and CTE Modernization

This progressive design-build project at Casa Roble High School demolished the existing Administration and Library buildings to create space for a new Administration and Student Union building. The single-story, approximately 17,400-SF steel-framed structure offers an open and flexible use of space for student gatherings and adaptive learning on campus. The semi-rural setting gives the school a unique sense of proximity to urban amenities while feeling as if one were in the countryside. The building itself is very modern with an exposed structure, clerestories, roof offsets and multi-tiered roof framing levels. The lateral force resisting system is steel ordinary concentric braced frames. The administrative one-stop-shop was treated with an angled wall that inverts the dominant mansard roof shapes that reflect the character of the existing campus buildings. In addition, the scope included the modernization of an existing classroom building, transforming it into a Career Technical Education (CTE) building to support health and science programs.

Client

JK Architecture + Engineering Flint Builders, Inc.

Year

2019

Scale

17,400 SF

Location

Orangevale, CA

More Projects

Adaptive ReuseMixed-useResidentialRetrofitSeismic Retrofit/Heritage Renovation

6th & Lucas Seismic Retrofit (The Mint)

Los Angeles, California

The seismic retrofit of 6th and Lucas, now called “The Mint,” was an adaptive reuse [..]

View Project

IndustrialTilt-UpWarehouse & Distribution

The Crossings @ 880

Fremont, CA

At nearly 700,000 SF on 40 acres, The Crossings @ 880 is the largest industrial [..]

View Project

Commercial

Pacific Life

Aliso Viejo, CA

This nine-story, 247,000-SF, steel-framed office building serves as the headquarters of Pacific Life’s Life Insurance [..]

View Project

Lab and Science

The Gateway Science Museum

Chico, CA

Showcases the natural diversity and geologic history of Northern California. Provides university faculty and students [..]

View Project

Civic

The Roebbelen Center At the Grounds Event Center

Roseville, CA

Formerly called the Placer County Fairgrounds, The Roebbelen Center @ the Grounds is the largest [..]

View Project

Transportation

Red Line Vemont

Los Angeles, CA

This 998-foot-long concrete cut-and-cover box structure is a key link in the Los Angeles Metro [..]

View Project

Save lives, impact economies.