Search
Close this search box.
Search
Close this search box.

Sacramento

Casa Roble High School Administration, Student Union and CTE Modernization

Casa Roble High School Administration, Student Union and CTE Modernization

This progressive design-build project at Casa Roble High School demolished the existing Administration and Library buildings to create space for a new Administration and Student Union building. The single-story, approximately 17,400-SF steel-framed structure offers an open and flexible use of space for student gatherings and adaptive learning on campus. The semi-rural setting gives the school a unique sense of proximity to urban amenities while feeling as if one were in the countryside. The building itself is very modern with an exposed structure, clerestories, roof offsets and multi-tiered roof framing levels. The lateral force resisting system is steel ordinary concentric braced frames. The administrative one-stop-shop was treated with an angled wall that inverts the dominant mansard roof shapes that reflect the character of the existing campus buildings. In addition, the scope included the modernization of an existing classroom building, transforming it into a Career Technical Education (CTE) building to support health and science programs.

Team Members

No data was found

Client

JK Architecture + Engineering Flint Builders, Inc.

Year

2019

Scale

17,400 SF

Location

Orangevale, CA

Casa Roble High School Administration, Student Union and CTE Modernization

This progressive design-build project at Casa Roble High School demolished the existing Administration and Library buildings to create space for a new Administration and Student Union building. The single-story, approximately 17,400-SF steel-framed structure offers an open and flexible use of space for student gatherings and adaptive learning on campus. The semi-rural setting gives the school a unique sense of proximity to urban amenities while feeling as if one were in the countryside. The building itself is very modern with an exposed structure, clerestories, roof offsets and multi-tiered roof framing levels. The lateral force resisting system is steel ordinary concentric braced frames. The administrative one-stop-shop was treated with an angled wall that inverts the dominant mansard roof shapes that reflect the character of the existing campus buildings. In addition, the scope included the modernization of an existing classroom building, transforming it into a Career Technical Education (CTE) building to support health and science programs.

Client

JK Architecture + Engineering Flint Builders, Inc.

Year

2019

Scale

17,400 SF

Location

Orangevale, CA

More Projects

Transportation

The Amtrack West Oakland Maintenance Facility

Oakland, CA

The Amtrack West Oakland Maintenance Facility incorporates bridge cranes, inspection and servicing pits, turntables and [..]

View Project

Industrial, Tilt-Up

3M Manufacturing

Irvine, Monrovia, Oak Hills and Northridge, CA

Miyamoto International performed ASCE 41-13 seismic risk mitigation cost-benefit analyses to understand the exposure to [..]

View Project

Commercial, Healthcare, Office, Tilt-Up

Sunnyvale Business Park Medical Office Building

Sunnyvale, CA

Miyamoto International is providing structural engineering services for the Sunnyvale Business Park buildings. The medical office building is [..]

View Project

Commercial, Lab and Science

Verily Campus Lab and Office Buildings

South San Francisco, CA

This project involved designing the exterior Buckle Restrained Braced Frame (BRBF) lateral system for two [..]

View Project

Commercial, Office

5210 Pacific Concourse TI

Los Angeles, CA

Miyamoto International offered structural engineering services for the 85,000-SF contemporary office building known as 52Ten, [..]

View Project

Residential

Valley Road Multi-Family

Reno, NV

Miyamoto is currently providing structural engineering services for this 235-unit residential and mixed-use development in [..]

View Project

Save lives, impact economies.