Pleasanton

Chevron, Building H-LL Global Security Information Center Renovation

Chevron, Building H-LL Global Security Information Center Renovation

The team provided electrical engineering services to convert an existing storage basement into a 24-hour global security infrastructure. We evaluated the existing power distribution system; due to critical operations, we designed a stand-alone “island” type distribution system with an alternative power source hook-up in case of extended normal power failures. We provided power for mechanical equipment—including a 20,000 CFM custom air handling unit—lighting, receptacles, telecom and data equipment, and fire alarm and public address systems. Due to space constraints in the original design, the team separated the supply fan and return fan sections of the custom air handling unit. We upgraded the existing lighting to LED lighting with circadian rhythm to aid in 24-hour operations. We used the Lutron Enlightened lighting control system in compliance with the California Energy Code and prepared Title 24 energy compliance forms. We also performed construction administration, commissioning, and close-out for this project in a timely manner.

Team Members

No data was found

Client

Informer Commercial Interiors

Year

2019–2020

Scale

9,200 SF

Location

San Ramon, CA

Chevron, Building H-LL Global Security Information Center Renovation

The team provided electrical engineering services to convert an existing storage basement into a 24-hour global security infrastructure. We evaluated the existing power distribution system; due to critical operations, we designed a stand-alone “island” type distribution system with an alternative power source hook-up in case of extended normal power failures. We provided power for mechanical equipment—including a 20,000 CFM custom air handling unit—lighting, receptacles, telecom and data equipment, and fire alarm and public address systems. Due to space constraints in the original design, the team separated the supply fan and return fan sections of the custom air handling unit. We upgraded the existing lighting to LED lighting with circadian rhythm to aid in 24-hour operations. We used the Lutron Enlightened lighting control system in compliance with the California Energy Code and prepared Title 24 energy compliance forms. We also performed construction administration, commissioning, and close-out for this project in a timely manner.

Client

Informer Commercial Interiors

Year

2019–2020

Scale

9,200 SF

Location

San Ramon, CA

More Projects

Commercial

Cutwater Distillery

Miramar, California

The new Cutwater Spirits craft distillery, which is believed to be the largest distillery on [..]

View Project

MEP

HumanGood Skilled Nursing Facility

Los Gatos, CA

Miyamoto International (formerly ATI Engineers) replaced two indoor cooling towers that had catastrophically failed by [..]

View Project

Industrial, Tilt-Up, Warehouse & Distribution

Cherry Logistics Center

Newark, CA

This project consists of a new single-multi-tenant industrial speculative facility located on a 29-acre site. [..]

View Project

Adaptive Reuse

Crossroads School for Arts & Sciences Pac Air Building Adaptive Reuse

Santa Monica, CA

Crossroads School for Arts & Sciences is wholly dedicated to serving the “greater community.” By [..]

View Project

Civic, Retrofit

Hollywood Bowl

Los Angeles, CA

The iconic Hollywood Bowl in Los Angeles is known for its band shell, a distinctive set [..]

View Project

Entertainment

GOALS Soccer Centers

Multiple California Locations

Goals Soccer Centers is the operator of dedicated five-a-side football centers that include 5,000 SF [..]

View Project

Save lives, impact economies.