Chevron, Building H-LL Global Security Information Center Renovation

Chevron, Building H-LL Global Security Information Center Renovation

The team provided electrical engineering services to convert an existing storage basement into a 24-hour global security infrastructure. We evaluated the existing power distribution system; due to critical operations, we designed a stand-alone “island” type distribution system with an alternative power source hook-up in case of extended normal power failures. We provided power for mechanical equipment—including a 20,000 CFM custom air handling unit—lighting, receptacles, telecom and data equipment, and fire alarm and public address systems. Due to space constraints in the original design, the team separated the supply fan and return fan sections of the custom air handling unit. We upgraded the existing lighting to LED lighting with circadian rhythm to aid in 24-hour operations. We used the Lutron Enlightened lighting control system in compliance with the California Energy Code and prepared Title 24 energy compliance forms. We also performed construction administration, commissioning, and close-out for this project in a timely manner.

Team Members

No data was found

Client

Informer Commercial Interiors

Year

2019–2020

Scale

9,200 SF

Location

San Ramon, CA

Chevron, Building H-LL Global Security Information Center Renovation

The team provided electrical engineering services to convert an existing storage basement into a 24-hour global security infrastructure. We evaluated the existing power distribution system; due to critical operations, we designed a stand-alone “island” type distribution system with an alternative power source hook-up in case of extended normal power failures. We provided power for mechanical equipment—including a 20,000 CFM custom air handling unit—lighting, receptacles, telecom and data equipment, and fire alarm and public address systems. Due to space constraints in the original design, the team separated the supply fan and return fan sections of the custom air handling unit. We upgraded the existing lighting to LED lighting with circadian rhythm to aid in 24-hour operations. We used the Lutron Enlightened lighting control system in compliance with the California Energy Code and prepared Title 24 energy compliance forms. We also performed construction administration, commissioning, and close-out for this project in a timely manner.

Client

Informer Commercial Interiors

Year

2019–2020

Scale

9,200 SF

Location

San Ramon, CA

More Projects

Commercial

Cutwater Distillery

Miramar, California

The new Cutwater Spirits craft distillery, which is believed to be the largest distillery on [..]

View Project

Civic

Antelope Valley Courthouse

Lancaster, CA

Highlighted by its unique barrel-shaped, three-story high atrium, the Michael D. Antonovich Courthouse is the [..]

View Project

Adaptive Reuse, Mixed-use, Residential, Retrofit, Seismic Retrofit/Heritage Renovation

6th & Lucas Seismic Retrofit (The Mint)

Los Angeles, California

The seismic retrofit of 6th and Lucas, now called “The Mint,” was an adaptive reuse [..]

View Project

Commercial, Residential, Seismic Retrofit/Heritage Renovation

Panomar

Alameda, CA

The seismic deficiencies of this 1960s-era, eight-story residential tower, formerly known as “Marina View Towers,” [..]

View Project

Education

Napa Hall, CSU Sacramento

Sacramento, CA

Napa Hall is the 34,000-SF home of California State University, Sacramento’s College of Continuing Education. [..]

View Project

Transportation

Exposition Light Rail Line Phase I

Los Angeles, CA

Miyamoto participated in the structural design of six at-grade and three elevated stations for new [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.