Search
Close this search box.

Pleasanton

City of Fremont Maintenance Storage Warehouse

City of Fremont Maintenance Storage Warehouse

The team provided electrical engineering services for a prefabricated metal building of approximately 10,000 square feet, single-story and with mezzanine storage. The building’s electrical tie-in was done at the main switchboard located at the site, and cables were appropriately sized to meet the voltage drop code requirement. We designed the power and low voltage conduit trench details as the cables were brought in through underground trenches. We provided power for mechanical equipment, lighting, receptacles, telecom and data equipment, and fire alarm and public address systems. We designed LED lighting for interior areas, high- bay and mezzanine, and exterior site lighting, and ran photometric calculations to determine appropriate light levels. Lighting controls were added to comply with the California Energy Code, and we prepared Title 24 energy compliance forms. We also performed construction administration, commissioning and close-out for this project in a timely manner.

Client

City of Fremont

Year

2021

Scale

10,000 SF

Location

Fremont, CA

City of Fremont Maintenance Storage Warehouse

The team provided electrical engineering services for a prefabricated metal building of approximately 10,000 square feet, single-story and with mezzanine storage. The building’s electrical tie-in was done at the main switchboard located at the site, and cables were appropriately sized to meet the voltage drop code requirement. We designed the power and low voltage conduit trench details as the cables were brought in through underground trenches. We provided power for mechanical equipment, lighting, receptacles, telecom and data equipment, and fire alarm and public address systems. We designed LED lighting for interior areas, high- bay and mezzanine, and exterior site lighting, and ran photometric calculations to determine appropriate light levels. Lighting controls were added to comply with the California Energy Code, and we prepared Title 24 energy compliance forms. We also performed construction administration, commissioning and close-out for this project in a timely manner.

Client

City of Fremont

Year

2021

Scale

10,000 SF

Location

Fremont, CA

More Projects

CommercialLab and Science

Verily Campus Lab and Office Buildings

South San Francisco, CA

This project involved designing the exterior Buckle Restrained Braced Frame (BRBF) lateral system for two [..]

View Project

BridgesCivicTransportation

Universal City Station Pedestrian Bridge

Universal City, CA

The Universal City Station Pedestrian Bridge is the fulfillment of a decades-long quest by Metro [..]

View Project

P-2000 Camp Pendleton MCB Mess Hall & Warehouse

Camp Pendleton, CA

This project in 62 Area of Camp Pendleton consists of designing and building a new [..]

View Project

Transportation

The Mobility Hub at LTCC

South Lake Tahoe, CA

The Mobility Hub at LTCC is part of a broader plan to bring clean transportation [..]

View Project

HealthcareLab and Science

Eisenhower La Quinta George and Julia Argyros Medical Center

La Quinta, CA

Limited by an existing urban campus, Eisenhower Health Centers made a plan to develop a [..]

View Project

Civic

Chumash Community Center

Colusa, CA

The new Chumash Community Center provides meeting rooms, offices, cultural learning classrooms, a computer lab, [..]

View Project

Save lives, impact economies.