SF Bay Area

City of Fremont Maintenance Storage Warehouse

City of Fremont Maintenance Storage Warehouse

The team provided electrical engineering services for a prefabricated metal building of approximately 10,000 square feet, single-story and with mezzanine storage. The building’s electrical tie-in was done at the main switchboard located at the site, and cables were appropriately sized to meet the voltage drop code requirement. We designed the power and low voltage conduit trench details as the cables were brought in through underground trenches. We provided power for mechanical equipment, lighting, receptacles, telecom and data equipment, and fire alarm and public address systems. We designed LED lighting for interior areas, high- bay and mezzanine, and exterior site lighting, and ran photometric calculations to determine appropriate light levels. Lighting controls were added to comply with the California Energy Code, and we prepared Title 24 energy compliance forms. We also performed construction administration, commissioning and close-out for this project in a timely manner.

Team Members

No data was found

Client

City of Fremont

Year

2021

Scale

10,000 SF

Location

Fremont, CA

City of Fremont Maintenance Storage Warehouse

The team provided electrical engineering services for a prefabricated metal building of approximately 10,000 square feet, single-story and with mezzanine storage. The building’s electrical tie-in was done at the main switchboard located at the site, and cables were appropriately sized to meet the voltage drop code requirement. We designed the power and low voltage conduit trench details as the cables were brought in through underground trenches. We provided power for mechanical equipment, lighting, receptacles, telecom and data equipment, and fire alarm and public address systems. We designed LED lighting for interior areas, high- bay and mezzanine, and exterior site lighting, and ran photometric calculations to determine appropriate light levels. Lighting controls were added to comply with the California Energy Code, and we prepared Title 24 energy compliance forms. We also performed construction administration, commissioning and close-out for this project in a timely manner.

Client

City of Fremont

Year

2021

Scale

10,000 SF

Location

Fremont, CA

More Projects

Adaptive Reuse, Retrofit

The Hoag On-Demand Care & Innovation Center

Irvine, CA

The Hoag On-Demand Care & Innovation Center is a masterclass example in adaptive reuse. Previously [..]

View Project

Industrial, Tilt-Up, Warehouse & Distribution

FedEx – Hayward

Hayward, CA

This 236,976-SF single-story concrete tilt-up on a 31-acre parcel in Hayward, California is being used [..]

View Project

Commercial, Mixed-use, Residential

City View @ Van Ness

Fresno, CA

City View @ Van Ness is a mixed-use, affordable housing project aimed at young professionals [..]

View Project

Adaptive Reuse, High-Rise, Hospitality, Mixed-use, Retrofit

Citizen Hotel

Sacramento, CA

The Citizen Hotel is one of Sacramento’s most iconic historic structures. Originally designed as a [..]

View Project

Parking

California State University Sacramento, Parking Structure I

Sacramento, CA

California State University, Sacramento is primarily a commuter school. With most students living off campus, [..]

View Project

Entertainment, Retrofit

The York Theater (Outside/In)

Los Angeles, CA

Miyamoto was given the opportunity to work on the conversion of this one-story, unreinforced masonry [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.