Orange County

Corona Police Department HQ

Corona Police Department HQ

The project involved a remodel and addition to an existing 72,000-SF building. The primary effort was focused on the building entry, where a former exterior patio was enclosed to create a more grandiose entryway. Miyamoto International provided structural engineering for the new roof structure over the lobby, which consisted of a 40-foot tall entry façade and a 1,000-SF expansion of the second floor. The work included seismic anchorage and detailing for new mechanical and electrical equipment. The project included structural design for a new 6,000-SF jail building including 17 cells, accommodations for guard stations, visiting rooms, kennels and a small kitchen. Miyamoto designed the new jail building to be functionally integrated with the existing police department building while providing seismic separation between the new and existing structures. Challenges included creating a foundation system that straddled an existing city water main and creating a bearing wall system that provided seismic safety as well as jail security.

Team Members

No data was found

Client

City of Corona (Owner),
Ware Malcomb (Architect)

Year

2010

Scale

9,300 SF Addition to 72,000 SF
Building

Location

Corona, CA

Corona Police Department HQ

The project involved a remodel and addition to an existing 72,000-SF building. The primary effort was focused on the building entry, where a former exterior patio was enclosed to create a more grandiose entryway. Miyamoto International provided structural engineering for the new roof structure over the lobby, which consisted of a 40-foot tall entry façade and a 1,000-SF expansion of the second floor. The work included seismic anchorage and detailing for new mechanical and electrical equipment. The project included structural design for a new 6,000-SF jail building including 17 cells, accommodations for guard stations, visiting rooms, kennels and a small kitchen. Miyamoto designed the new jail building to be functionally integrated with the existing police department building while providing seismic separation between the new and existing structures. Challenges included creating a foundation system that straddled an existing city water main and creating a bearing wall system that provided seismic safety as well as jail security.

Client

City of Corona (Owner),
Ware Malcomb (Architect)

Year

2010

Scale

9,300 SF Addition to 72,000 SF
Building

Location

Corona, CA

More Projects

Lab and Science

Mercy Oncology Center

Sacramento, CA

Miyamoto International was part of the team that converted this building, previously occupied by the [..]

View Project

Civic, Education

Northridge Library

Northridge, CA

This library is a 13,000 square foot replacement library for the Northridge community. The building [..]

View Project

Industrial, Tilt-Up

Northgate Business Park Building 3

North Las Vegas, NV

Miyamoto was the engineer on this 813,120-SF, single-story facility in North Las Vegas serving as [..]

View Project

Education

Peralta Community College Master Plan

Oakland, CA
Berkeley, CA
Bay Area, CA

This Master Plan consists of evaluating more than 40 buildings on five campuses within the [..]

View Project

Transportation

Metro Gold Line Eastside Extension

Los Angeles, CA

The Gold Line, which originally ran from Downtown LA to Pasadena, was extended in 2009 [..]

View Project

Office, Tilt-Up, Warehouse & Distribution

Rubbercraft Headquarters

Long Beach, CA

Miyamoto’s effort was 100% during the design phase and up to 50% during the construction [..]

View Project

Save lives, impact economies.