Search
Close this search box.

County of San Diego Juvenile Justice Facility

County of San Diego Juvenile Justice Facility

The Juvenile Justice Campus phase 1 is a partial replacement for the existing Juvenile Hall building that was built in 1954. The new facility consists of four housing units with 96 beds total, an education complex with a gymnasium, and a support building that includes, administration, medical, intake, security, food service, dining, laundry and maintenance. A total of eleven new structures are being constructed which include approximately 131,000 square feet of space for a cost of $130M. Over a quarter of a million colored masonry blocks were utilized, including many that were insulated, reducing the carbon footprint and operating costs for the facility.

Awards

2022 National Award — Excellence, DBIA’s National Project / Team Awards

Client

DLR Group, Inc.

Year

2021

Scale

131,000 SF – Phase 1

Location

San Diego

County of San Diego Juvenile Justice Facility

The Juvenile Justice Campus phase 1 is a partial replacement for the existing Juvenile Hall building that was built in 1954. The new facility consists of four housing units with 96 beds total, an education complex with a gymnasium, and a support building that includes, administration, medical, intake, security, food service, dining, laundry and maintenance. A total of eleven new structures are being constructed which include approximately 131,000 square feet of space for a cost of $130M. Over a quarter of a million colored masonry blocks were utilized, including many that were insulated, reducing the carbon footprint and operating costs for the facility.

Awards

2022 National Award — Excellence, DBIA’s National Project / Team Awards

Client

DLR Group, Inc.

Year

2021

Scale

131,000 SF – Phase 1

Location

San Diego

More Projects

HealthcareSustainability

Sutter Health North Bay Regional Surgery Center Novato

Novato, CA

Miyamoto International has remodeled this existing 3-story office building to become a medical office building [..]

View Project

Transportation

Metro Gold Line Eastside Extension

Los Angeles, CA

The Gold Line, which originally ran from Downtown LA to Pasadena, was extended in 2009 [..]

View Project

CommercialOffice

Milpitas Campus Center

Milpitas, CA

Miyamoto International provided structural engineering services for the renovation of the Milpitas Campus Center. This [..]

View Project

AviationCommercial

LAX Airport, Southwest Terminal 1 Modernization

Los Angeles, CA

Southwest Airlines underwent a complete development program to modernize Terminal 1 at Los Angeles International [..]

View Project

Aviation

LAX Bradley West Enabling Projects

Los Angeles, CA

As part of the $1.3 billion LAX BradleyWest Expansion project, Miyamoto played a vital role [..]

View Project

Tilt-UpWarehouse & Distribution

West Corona Industrial Center

Corona, CA

Miyamoto International’s effort on the West Corona Industrial Center was 100 percent during the design [..]

View Project

Save lives, impact economies.