Sacramento

Eisenhower La Quinta George and Julia Argyros Medical Center

Eisenhower La Quinta George and Julia Argyros Medical Center

Limited by an existing urban campus, Eisenhower Health Centers made a plan to develop a satellite campus that could bring state-of-the-art healthcare to a growing market. The three-story, 96,000-square-foot George and Julia Argyros Health Center we designed is the first building on this new campus. It houses a multi-specialty medical group, an orthopedic single-specialty group, a family practice residency, an imaging center, radiation oncology, wellness facilities, and urgent care.

Located prominently on a hill, this facility presents a highly visible image of quality care to the community and sets the tone for the overall impression of the campus. The project presented many challenges, including the design of the Linear Accelerator Room (LINAC), which was seismically designed separately from the building in case of seismic activity to protect crucial medical equipment.

Team Members

No data was found

Client

-

Year

2009

Scale

96,000 SF

Location

La Quinta, CA

Eisenhower La Quinta George and Julia Argyros Medical Center

Limited by an existing urban campus, Eisenhower Health Centers made a plan to develop a satellite campus that could bring state-of-the-art healthcare to a growing market. The three-story, 96,000-square-foot George and Julia Argyros Health Center we designed is the first building on this new campus. It houses a multi-specialty medical group, an orthopedic single-specialty group, a family practice residency, an imaging center, radiation oncology, wellness facilities, and urgent care.

Located prominently on a hill, this facility presents a highly visible image of quality care to the community and sets the tone for the overall impression of the campus. The project presented many challenges, including the design of the Linear Accelerator Room (LINAC), which was seismically designed separately from the building in case of seismic activity to protect crucial medical equipment.

Client

-

Year

2009

Scale

96,000 SF

Location

La Quinta, CA

More Projects

Bridges

The C3 Parking Structure

Culver City, CA

The C3 parking structure is a new nine-level, 1,010-stall high-rise parking structure designed by Miyamoto [..]

View Project

Education

Ripon Unified School District & Ripon High School CTE Building 

Ripon, CA

This Career Technical Education (CTE) Building at Ripon High School is a new, state-of-the-art education [..]

View Project

U.S. Armed Forces Reserve Center, Fort Allen

Juana Diaz, PR

Miyamoto International served as the structural Quality Control (QC) inspector for this U.S. Armed Forces [..]

View Project

Civic

Belmont Plaza Natatorium Seismic Upgrade Study

Long Beach, CA

This landmark structure is located only a few yards from The Strand, in Long Beach’s [..]

View Project

Office

Orange County Transportation Authority Transit Security and Operations Center

Anaheim, CA

Miyamoto is providing structural engineering services for the two-story, 32,000-square-foot OCTA Transit Security and Operati [..]

View Project

Healthcare

Sutter Health Radiation Oncology Center

Sacramento, CA

The NPC-4 Evaluation of the Sutter Health Radiation Oncology Center consisted of reviewing as-built documentation [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.