Eskişehir Public Hospital

Eskişehir Public Hospital

The Ministry of Health has started a large-scale investment program with the goal of eliminating small-capacity healthcare facilities in crowded downtown areas, consolidating them into more efficient and accessible single locations.  Approximately 200 large-city campus hospitals will be constructed in the next decade, funded by public-private partnerships. The Eskisehir City Hospital campus is part of this program. The campus has 1,081 beds, including 715-bed General Hospital, 139-bed Cardiovascular Surgery Hospital, 127-bed Oncology Hospital and 100-bed High-Security Forensic Psychiatry Hospital. Located in Eskisehir city, the campus is in a first-degree (highest) seismic zone. Therefore, 973 double-friction pendulum-type isolators were utilized as a high-performance engineering solution to provide uninterrupted operation after an earthquake. The project includes site-specific seismic hazard analysis, seismic isolation system design on the upper structure, as well as design and cost analyses.

Team Members

No data was found

Client

Ministry of Health

Year

-

Scale

333,000 m2

Location

Eskişehir, Turkey

Eskişehir Public Hospital

The Ministry of Health has started a large-scale investment program with the goal of eliminating small-capacity healthcare facilities in crowded downtown areas, consolidating them into more efficient and accessible single locations.  Approximately 200 large-city campus hospitals will be constructed in the next decade, funded by public-private partnerships. The Eskisehir City Hospital campus is part of this program. The campus has 1,081 beds, including 715-bed General Hospital, 139-bed Cardiovascular Surgery Hospital, 127-bed Oncology Hospital and 100-bed High-Security Forensic Psychiatry Hospital. Located in Eskisehir city, the campus is in a first-degree (highest) seismic zone. Therefore, 973 double-friction pendulum-type isolators were utilized as a high-performance engineering solution to provide uninterrupted operation after an earthquake. The project includes site-specific seismic hazard analysis, seismic isolation system design on the upper structure, as well as design and cost analyses.

Client

Ministry of Health

Year

-

Scale

333,000 m2

Location

Eskişehir, Turkey

More Projects

Industrial

Hakusan Sake Gardens

Napa, CA

Hakusan Sake chose Napa, California as their United States headquarters for the production and warehouse [..]

View Project

Burlingame Park at 410 Airport Blvd Phase 1B

Burlingame, CA

A vacant nine-acre property at 410 Blvd is planned to be turned into a natural [..]

View Project

Industrial, Tilt-Up, Warehouse & Distribution

Prologis Cheyenne Distribution Center

Clark County, NV

Prologis Cheyenne #3 is a 163,000-SF single-story concrete distribution center in Clark County, Nevada built [..]

View Project

Civic, Transportation

Los Angeles Regional Transportation Management Center

Los Angeles, CA

The Los Angeles Regional Transportation Management Center serves as the emergency command center for the [..]

View Project

Transportation

Port of Long Beach Pier B On-Dock Rail Support Facility

Long Beach, CA

To make way for a more sustainable future, the Port of Long Beach is modernizing [..]

View Project

Residential

Hornet Commons

Sacramento, CA

This new student housing village at Sacramento State is an apartment-style community aimed at upper-division [..]

View Project

Save lives, impact economies.