Search
Close this search box.

Estancia High School Aquatic Center

Estancia High School Aquatic Center

The Estancia High School Aquatic Center received a complete make-over, much to the excitement and anticipation of the Costa Mesa swimming community. The project saw to the demolition of the old 25-meter pool and the construction of a new 50-meter pool. To ensure that practices were not disturbed, Estancia’s aquatic sports practices were held at another district’s school. The renovations of the aquatic center also added new offices for the coaching staff, team rooms, restrooms, shade structures, a snack bar and a lunch area. No existing structural drawings were available for the project. Miyamoto created a data collection program to verify the existing roof structures for the gym, locker room building “L” and administration building “F” to modify the structure for improvements to the pool. Miyamoto worked through the design approach with DSA to minimize the amount of strengthening required to maintain the project construction budget.

Client

Counsilman - Hunsaker

Year

2021

Scale

50-Meter Pool

Location

Costa Mesa, CA

Estancia High School Aquatic Center

The Estancia High School Aquatic Center received a complete make-over, much to the excitement and anticipation of the Costa Mesa swimming community. The project saw to the demolition of the old 25-meter pool and the construction of a new 50-meter pool. To ensure that practices were not disturbed, Estancia’s aquatic sports practices were held at another district’s school. The renovations of the aquatic center also added new offices for the coaching staff, team rooms, restrooms, shade structures, a snack bar and a lunch area. No existing structural drawings were available for the project. Miyamoto created a data collection program to verify the existing roof structures for the gym, locker room building “L” and administration building “F” to modify the structure for improvements to the pool. Miyamoto worked through the design approach with DSA to minimize the amount of strengthening required to maintain the project construction budget.

Client

Counsilman - Hunsaker

Year

2021

Scale

50-Meter Pool

Location

Costa Mesa, CA

More Projects

Education

The SEED School of Los Angeles County

Los Angeles, CA

The SEED School of Los Angeles County is a public college-prep boarding high school that [..]

View Project

EducationLab and ScienceRetrofit

Bella Vista High School STEM Building

Fair Oaks, CA

Bella Vista High School is adding a new $13 million, 22,000-SF Science, Technology, Engineering and [..]

View Project

CommercialHigh-RiseMixed-useResidentialRetail

Reno Mixed-Use High Rise

Reno, NV

Miyamoto is engineering a 23-story, mixed-use, high-rise with three levels of underground parking, ground-level retail [..]

View Project

Adaptive ReuseCommercialResidentialRetailRetrofitSeismic Retrofit/Heritage Renovation

The Elliott Building

Sacramento, CA

The Elliott Building is an 80-year-old, historic concrete structure that formerly housed a car dealership [..]

View Project

CommercialEntertainment

Raley Field, Legacy Club Addition

West Sacramento, CA

When the River Cats Triple-A Baseball Team decided to add a 5,000-SF private club at [..]

View Project

High-Rise

Grand Shamaya (Phase 1)

Surabaya, Indonesia

The 150,000 sqm. development is a high specification residential towers in Surabaya, Indonesia. Phase 1 [..]

View Project

Save lives, impact economies.