Estancia High School Aquatic Center

Estancia High School Aquatic Center

The Estancia High School Aquatic Center received a complete make-over, much to the excitement and anticipation of the Costa Mesa swimming community. The project saw to the demolition of the old 25-meter pool and the construction of a new 50-meter pool. To ensure that practices were not disturbed, Estancia’s aquatic sports practices were held at another district’s school. The renovations of the aquatic center also added new offices for the coaching staff, team rooms, restrooms, shade structures, a snack bar and a lunch area. No existing structural drawings were available for the project. Miyamoto created a data collection program to verify the existing roof structures for the gym, locker room building “L” and administration building “F” to modify the structure for improvements to the pool. Miyamoto worked through the design approach with DSA to minimize the amount of strengthening required to maintain the project construction budget.

Team Members

No data was found

Client

Counsilman - Hunsaker

Year

2021

Scale

50-Meter Pool

Location

Costa Mesa, CA

Estancia High School Aquatic Center

The Estancia High School Aquatic Center received a complete make-over, much to the excitement and anticipation of the Costa Mesa swimming community. The project saw to the demolition of the old 25-meter pool and the construction of a new 50-meter pool. To ensure that practices were not disturbed, Estancia’s aquatic sports practices were held at another district’s school. The renovations of the aquatic center also added new offices for the coaching staff, team rooms, restrooms, shade structures, a snack bar and a lunch area. No existing structural drawings were available for the project. Miyamoto created a data collection program to verify the existing roof structures for the gym, locker room building “L” and administration building “F” to modify the structure for improvements to the pool. Miyamoto worked through the design approach with DSA to minimize the amount of strengthening required to maintain the project construction budget.

Client

Counsilman - Hunsaker

Year

2021

Scale

50-Meter Pool

Location

Costa Mesa, CA

More Projects

Lab and Science

The North Medical Office Building and Ambulatory Surgery Center

Yuba City, CA

The North Medical Office Building and Ambulatory Surgery Center, a two-story, 40,000-SF steel-framed structure, is [..]

View Project

U.S. Armed Forces Reserve Center, Fort Allen

Juana Diaz, PR

Miyamoto International served as the structural Quality Control (QC) inspector for this U.S. Armed Forces [..]

View Project

Aviation, Commercial

LAX Airport, Southwest Terminal 1 Modernization

Los Angeles, CA

Southwest Airlines underwent a complete development program to modernize Terminal 1 at Los Angeles International [..]

View Project

San Jose Municipal Water System Headquarters 

San Jose, CA

This San Jose Municipal Water System facility serves as the new headquarters for Muni Water, [..]

View Project

Office, Tilt-Up

The Press Sunflower Addition

Costa Mesa, CA

Miyamoto Internati onal provided structural engineering services for the expansion of the Los Angeles Times’ [..]

View Project

Adaptive Reuse, Hospitality, Office, Parking, Tilt-Up

3333 & 3407 Casitas Atwater Village Adaptive Reuse

Los Angeles, CA

Creatives deserve a creative workspace and environment, and what inspires the mind more than taking [..]

View Project

Save lives, impact economies.