Exposition Light Rail Line Phase I

Exposition Light Rail Line Phase I


Miyamoto participated in the structural design of six at-grade and three elevated stations for new light rail line extending 8.6 miles from downtown Los Angeles to Culver City. Our work included evaluating preliminary design documents and working with the architect to develop more constructable design alternatives, training engineers in Expo Authority processes and design standards, performing QA on all drawings and calculations, supervising Construction Administration efforts and developing testing program for canopy shade panel mockups.

The Expo Line stations are distinctive because of their extensive use of slender bent steel tubes for the framing of the canopies, shade structures and elevator shafts. These features were made possible through extensive modeling and analysis efforts, as well as careful detailing and coordination. All structural elements were designed with an eye to minimizing field work and speeding station construction, as evidenced by the use of modular canopy segments and precast concrete platform slabs.

Team Members

No data was found

Client

-

Year

2010

Scale

8.6 Miles

Location

Los Angeles, CA

Exposition Light Rail Line Phase I


Miyamoto participated in the structural design of six at-grade and three elevated stations for new light rail line extending 8.6 miles from downtown Los Angeles to Culver City. Our work included evaluating preliminary design documents and working with the architect to develop more constructable design alternatives, training engineers in Expo Authority processes and design standards, performing QA on all drawings and calculations, supervising Construction Administration efforts and developing testing program for canopy shade panel mockups.

The Expo Line stations are distinctive because of their extensive use of slender bent steel tubes for the framing of the canopies, shade structures and elevator shafts. These features were made possible through extensive modeling and analysis efforts, as well as careful detailing and coordination. All structural elements were designed with an eye to minimizing field work and speeding station construction, as evidenced by the use of modular canopy segments and precast concrete platform slabs.

Client

-

Year

2010

Scale

8.6 Miles

Location

Los Angeles, CA

More Projects

Hospitality

The Westin (formerly Le Rivage)

Sacramento, CA

Located alongside the Sacramento River just two miles from downtown and the State Capitol Building, [..]

View Project

Education

CSU Sacramento AIRC

Sacramento, CA

Located on the California State University Sacramento campus, the Academic Information Resource Center (AIRC) is [..]

View Project

Education

Southwestern College, Wellness and Aquatic Center

Chula Vista, CA

As part of Southwestern College’s master planning effort for its facilities, this new wellness and [..]

View Project

Retail

San Francisco Public Utilities Commission

San Francisco, CA

Relocating the division from its existing location at 1990 Newcomb Avenue to 2000 Marin Street. [..]

View Project

Adaptive Reuse, Retrofit

Antler Hotel, Historic and Seismic Rehabilitation

Lemoore, CA

This two-story, unreinforced masonry (URM) building with a partial basement is located in the heart [..]

View Project

Education

Fairfield-Suisun Unified School District, Suisun Valley K-8 Library and Administration Building

Fairfield, CA

Miyamoto International provided structural engineering services at the Suisun Valley K-8 school for the new [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.