Exposition Light Rail Line Phase I

Exposition Light Rail Line Phase I


Miyamoto participated in the structural design of six at-grade and three elevated stations for new light rail line extending 8.6 miles from downtown Los Angeles to Culver City. Our work included evaluating preliminary design documents and working with the architect to develop more constructable design alternatives, training engineers in Expo Authority processes and design standards, performing QA on all drawings and calculations, supervising Construction Administration efforts and developing testing program for canopy shade panel mockups.

The Expo Line stations are distinctive because of their extensive use of slender bent steel tubes for the framing of the canopies, shade structures and elevator shafts. These features were made possible through extensive modeling and analysis efforts, as well as careful detailing and coordination. All structural elements were designed with an eye to minimizing field work and speeding station construction, as evidenced by the use of modular canopy segments and precast concrete platform slabs.

Client

-

Year

2010

Scale

8.6 Miles

Location

Los Angeles, CA

Exposition Light Rail Line Phase I


Miyamoto participated in the structural design of six at-grade and three elevated stations for new light rail line extending 8.6 miles from downtown Los Angeles to Culver City. Our work included evaluating preliminary design documents and working with the architect to develop more constructable design alternatives, training engineers in Expo Authority processes and design standards, performing QA on all drawings and calculations, supervising Construction Administration efforts and developing testing program for canopy shade panel mockups.

The Expo Line stations are distinctive because of their extensive use of slender bent steel tubes for the framing of the canopies, shade structures and elevator shafts. These features were made possible through extensive modeling and analysis efforts, as well as careful detailing and coordination. All structural elements were designed with an eye to minimizing field work and speeding station construction, as evidenced by the use of modular canopy segments and precast concrete platform slabs.

Client

-

Year

2010

Scale

8.6 Miles

Location

Los Angeles, CA

More Projects

Retrofit

Carriger Winery

Sonoma, CA

Miyamoto International performed a structural evaluation and developed seismic retrofit design for this historic barn [..]

View Project

IndustrialTilt-Up

Tesla Flower Mound

Flower Mound, Texas

Tesla Flower Mound is a one-story tilt-up building that will house a Tesla SSD Center, [..]

View Project

Adaptive ReuseCivic

Yuba County Sheriff Facility

Marysville, CA

This adaptive re-use project entailed re-purposing and improving an existing two-story, tilt-up commercial office building [..]

View Project

Civic

Corona Police Department HQ

Corona, CA

The project involved a remodel and addition to an existing 72,000-SF building. The primary effort [..]

View Project

IndustrialTilt-Up

Tesla 3912 Calle Fortunada Tenant Improvement

San Diego, CA

Containing a 56,000-SF warehouse and two 985-SF mechanical yards, this tenant improvement project at 3912 [..]

View Project

IndustrialTilt-UpWarehouse & Distribution

FedEx – Hayward

Hayward, CA

This 236,976-SF single-story concrete tilt-up on a 31-acre parcel in Hayward, California is being used [..]

View Project

Save lives, impact economies.