Sacramento

Gemini TI

Gemini TI

Gemini TI is a tenant improvement project, which converted 25,000-SF of warehouse space into a biotech office, lab and manufacturing space. The modifications included new openings in the existing concrete tilt-up wall panels, support for new rooftop mechanical equipment, infilling the loading dock and trenching/depressing the existing slab. The new office space features private offices, open office workstations, a board room and conference rooms with operable glass partitions. The warehouse space has tall storage racks and a pre-manufactured cold storage room. For its roof, Miyamoto utilized the existing structure by placing the new rooftop units in strategic positions to minimize the need for structural strengthening. The manufacturing space is a light-framed steel structure within the overall concrete building, which is kept secure with gowning, clean corridors, autoclave, processing and storage. Its frame consists of light-gauge joists which span to light-gauge stud walls to provide support for the ceilings and suspended equipment.

Team Members

No data was found

Client

DG Architects

Year

2020

Scale

25,000 SF

Location

West Sacramento, CA

Gemini TI

Gemini TI is a tenant improvement project, which converted 25,000-SF of warehouse space into a biotech office, lab and manufacturing space. The modifications included new openings in the existing concrete tilt-up wall panels, support for new rooftop mechanical equipment, infilling the loading dock and trenching/depressing the existing slab. The new office space features private offices, open office workstations, a board room and conference rooms with operable glass partitions. The warehouse space has tall storage racks and a pre-manufactured cold storage room. For its roof, Miyamoto utilized the existing structure by placing the new rooftop units in strategic positions to minimize the need for structural strengthening. The manufacturing space is a light-framed steel structure within the overall concrete building, which is kept secure with gowning, clean corridors, autoclave, processing and storage. Its frame consists of light-gauge joists which span to light-gauge stud walls to provide support for the ceilings and suspended equipment.

Client

DG Architects

Year

2020

Scale

25,000 SF

Location

West Sacramento, CA

More Projects

Industrial

TAB Products

Sylmar, CA

TAB Products, a nationwide leader in records storage and information management, requested Miyamoto’s assistance and [..]

View Project

Commercial, Mixed-use, Residential

City View @ Van Ness

Fresno, CA

City View @ Van Ness is a mixed-use, affordable housing project aimed at young professionals [..]

View Project

Commercial, Retail

Ebner and Empire Buildings

Sacramento, CA

The Ebner Building is an integral piece of Old Sacramento history. The original building was [..]

View Project

Retail

722 S. Broadway Building Adaptive Reuse

Los Angeles, CA

The 722 S. Broadway Building is an adaptive reuse and seismic upgrade of an existing [..]

View Project

Industrial, Tilt-Up, Warehouse & Distribution

FedEx – Hayward

Hayward, CA

This 236,976-SF single-story concrete tilt-up on a 31-acre parcel in Hayward, California is being used [..]

View Project

Education, Seismic Rehabilitation

UCR Chapman Hall Seismic Assessment

Riverside, CA

Miyamoto International performed a seismic evaluation of Chapman Hall, a 2-story concrete building constructed in [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.