Search
Close this search box.
Search
Close this search box.

Sacramento

Gemini TI

Gemini TI

Gemini TI is a tenant improvement project, which converted 25,000-SF of warehouse space into a biotech office, lab and manufacturing space. The modifications included new openings in the existing concrete tilt-up wall panels, support for new rooftop mechanical equipment, infilling the loading dock and trenching/depressing the existing slab. The new office space features private offices, open office workstations, a board room and conference rooms with operable glass partitions. The warehouse space has tall storage racks and a pre-manufactured cold storage room. For its roof, Miyamoto utilized the existing structure by placing the new rooftop units in strategic positions to minimize the need for structural strengthening. The manufacturing space is a light-framed steel structure within the overall concrete building, which is kept secure with gowning, clean corridors, autoclave, processing and storage. Its frame consists of light-gauge joists which span to light-gauge stud walls to provide support for the ceilings and suspended equipment.

Team Members

No data was found

Client

DG Architects

Year

2020

Scale

25,000 SF

Location

West Sacramento, CA

Gemini TI

Gemini TI is a tenant improvement project, which converted 25,000-SF of warehouse space into a biotech office, lab and manufacturing space. The modifications included new openings in the existing concrete tilt-up wall panels, support for new rooftop mechanical equipment, infilling the loading dock and trenching/depressing the existing slab. The new office space features private offices, open office workstations, a board room and conference rooms with operable glass partitions. The warehouse space has tall storage racks and a pre-manufactured cold storage room. For its roof, Miyamoto utilized the existing structure by placing the new rooftop units in strategic positions to minimize the need for structural strengthening. The manufacturing space is a light-framed steel structure within the overall concrete building, which is kept secure with gowning, clean corridors, autoclave, processing and storage. Its frame consists of light-gauge joists which span to light-gauge stud walls to provide support for the ceilings and suspended equipment.

Client

DG Architects

Year

2020

Scale

25,000 SF

Location

West Sacramento, CA

More Projects

Commercial, Lab and Science

Verily Campus Lab and Office Buildings

South San Francisco, CA

This project involved designing the exterior Buckle Restrained Braced Frame (BRBF) lateral system for two [..]

View Project

Lab and Science

Integrated Care Center Huntington Beach

Huntington Beach, CA

The new Integrated Care Center was initiated by Hoag Medical Group to create a more [..]

View Project

Lab and Science

Mercy Oncology Center

Sacramento, CA

Miyamoto International was part of the team that converted this building, previously occupied by the [..]

View Project

Education

Southwestern College Field House and Central Plant

Chula Vista, CA

Southwestern College’s DeVore Stadium has been dramatically upgraded to not only be one of the [..]

View Project

Industrial, Tilt-Up

Tesla 3888 Calle Fortunada

San Diego, CA

The tenant improvement at 3888 Calle Fortunada involved modifying two existing concrete tilt-up warehouse buildings [..]

View Project

Commercial

Christ Community Church Multipurpose Room

Carmichael, CA

This new multi-use facility ties into the existing modern style of Christ Community Church, creating [..]

View Project

Save lives, impact economies.