Los Angeles

Good Eggs Tenant Improvement

Good Eggs Tenant Improvement

Miyamoto provided tenant improvement services to an existing tilt-up building owned by a grocery delivery service company. The client brought Miyamoto on to the team to prepare the slab for a 7,975-SF walk-in freezer and to provide engineering solutions for the support of the cooler/freezer walls and ceilings. We also provided support for the mechanical units above and below the roof to keep the 44,482-SF cooler area, along with the freezer area, at the necessary temperatures to maintain the freshness of the product.

Team Members

No data was found

Client

Sutti Associates

Year

2019

Scale

115,830 SF

Location

Oakland, CA

Good Eggs Tenant Improvement

Miyamoto provided tenant improvement services to an existing tilt-up building owned by a grocery delivery service company. The client brought Miyamoto on to the team to prepare the slab for a 7,975-SF walk-in freezer and to provide engineering solutions for the support of the cooler/freezer walls and ceilings. We also provided support for the mechanical units above and below the roof to keep the 44,482-SF cooler area, along with the freezer area, at the necessary temperatures to maintain the freshness of the product.

Client

Sutti Associates

Year

2019

Scale

115,830 SF

Location

Oakland, CA

More Projects

Residential

iBUILD-Miyamoto

Puerto Rico

This new digitized assessment tool allows engineers and architects to monitor the construction of new [..]

View Project

Civic

RUHS Behavioral Health, Franklin Residential Care Facility & Behavioral Health Clinic 

Riverside, CA

The Franklin Residential Care Facility & Behavioral Health Clinic, a two-story, tilt-up structure, is the [..]

View Project

Lab and Science

The Gateway Science Museum

Chico, CA

Showcases the natural diversity and geologic history of Northern California. Provides university faculty and students [..]

View Project

Retrofit

Caribbean School, Science Labs Structural Repairs

Ponce, PR

During the 2020 Puerto Rico earthquake, a magnitude 6.4 that was preceded by a swarm [..]

View Project

MEP

HumanGood Skilled Nursing Facility

Los Gatos, CA

Miyamoto International (formerly ATI Engineers) replaced two indoor cooling towers that had catastrophically failed by [..]

View Project

Industrial, Tilt-Up

Calexico Crossings II

Calexico, CA

Located near the Calexico East Port of entry with Mexicali, the Calexico Crossings II project [..]

View Project

Save lives, impact economies.