Search
Close this search box.

Los Angeles

Good Eggs Tenant Improvement

Good Eggs Tenant Improvement

Miyamoto provided tenant improvement services to an existing tilt-up building owned by a grocery delivery service company. The client brought Miyamoto on to the team to prepare the slab for a 7,975-SF walk-in freezer and to provide engineering solutions for the support of the cooler/freezer walls and ceilings. We also provided support for the mechanical units above and below the roof to keep the 44,482-SF cooler area, along with the freezer area, at the necessary temperatures to maintain the freshness of the product.

Client

Sutti Associates

Year

2019

Scale

115,830 SF

Location

Oakland, CA

Good Eggs Tenant Improvement

Miyamoto provided tenant improvement services to an existing tilt-up building owned by a grocery delivery service company. The client brought Miyamoto on to the team to prepare the slab for a 7,975-SF walk-in freezer and to provide engineering solutions for the support of the cooler/freezer walls and ceilings. We also provided support for the mechanical units above and below the roof to keep the 44,482-SF cooler area, along with the freezer area, at the necessary temperatures to maintain the freshness of the product.

Client

Sutti Associates

Year

2019

Scale

115,830 SF

Location

Oakland, CA

More Projects

EducationHealthcare

UCSD Health Sciences & Medical Center

San Diego, California

The UCSD Health Sciences & Medical Center was designed to provide office space for doctors [..]

View Project

EducationSeismic Rehabilitation

UCR Chapman Hall Seismic Assessment

Riverside, CA

Miyamoto International performed a seismic evaluation of Chapman Hall, a 2-story concrete building constructed in [..]

View Project

HealthcareLab and Science

Sutter Gould Medical Foundation Modesto

Modesto, CA

Sutter Gould Medical Foundation is a four-story, 132,600 square foot, steel framed structure. This state-of-the-art [..]

View Project

Industrial

JFC Distribution Center

Commerce, CA

Miyamoto provided structural engineering for the conversion of this existing 190,000-SF warehouse in Commerce to [..]

View Project

Lab and Science

University of California, Irvine, Medical Center Replacement Hospital, Phases 1 and 2

Torrance, CA

Miyamoto provided structural peer review services for the bridging and construction documents of this design-build [..]

View Project

Residential

Picasso Pasadena

Pasadena, CA

Design of a new 98-unit, 5-story above-grade, type III residential construction with three levels of [..]

View Project

Save lives, impact economies.