Miyamoto completed the renovation of an existing 1-story, Fire Station, including a 1-story, 560-SF addition. The renovation of the existing fire station included several modifications to existing shear walls (both wood-framed and masonry that trigger seismic upgrade requirements (i.e., modifications to a building that increases seismic shear demand to existing lateral-force resisting elements by 10% or more). As a result, the existing structure was brought into conformance with the current building code (2007 CBC).
City of Grass Valley
2011
4,950SF
Grass Valley, CA
Miyamoto completed the renovation of an existing 1-story, Fire Station, including a 1-story, 560-SF addition. The renovation of the existing fire station included several modifications to existing shear walls (both wood-framed and masonry that trigger seismic upgrade requirements (i.e., modifications to a building that increases seismic shear demand to existing lateral-force resisting elements by 10% or more). As a result, the existing structure was brought into conformance with the current building code (2007 CBC).
City of Grass Valley
2011
4,950SF
Grass Valley, CA
Subscribe to learn about new the latest in engineering news, solutions, and updates.
We care about your data in our privacy policy.