Orange County

Hale Medical Office Building

Hale Medical Office Building

Hale Medical Center has an interesting story. Because the Methodist Hospital located in Arcadia, California had an overflow of outpatient clients due to recent changes in federal healthcare legislation, a new building was required. To support this sudden need, Miyamoto International provided structural engineering design services for a four-story, concrete tilt-up medical office building. The 18,000-SF floor plate and 72,000-SF total building are on conventional continuous and isolated concrete pad footings. Miyamoto also provided design services for a steel pedestrian bridge connecting the new medical office building (MOB) to the current Methodist Hospital. This allows patients to quickly access the medical building located across the street.

Seeing a building go up “in days” was a wonder to the community. A video of how we do this can be seen here.

Team Members

No data was found

Client

-

Year

2012

Scale

72,000 SF

Location

Arcadia, CA

Hale Medical Office Building

Hale Medical Center has an interesting story. Because the Methodist Hospital located in Arcadia, California had an overflow of outpatient clients due to recent changes in federal healthcare legislation, a new building was required. To support this sudden need, Miyamoto International provided structural engineering design services for a four-story, concrete tilt-up medical office building. The 18,000-SF floor plate and 72,000-SF total building are on conventional continuous and isolated concrete pad footings. Miyamoto also provided design services for a steel pedestrian bridge connecting the new medical office building (MOB) to the current Methodist Hospital. This allows patients to quickly access the medical building located across the street.

Seeing a building go up “in days” was a wonder to the community. A video of how we do this can be seen here.

Client

-

Year

2012

Scale

72,000 SF

Location

Arcadia, CA

More Projects

Bridges

The C3 Parking Structure

Culver City, CA

The C3 parking structure is a new nine-level, 1,010-stall high-rise parking structure designed by Miyamoto [..]

View Project

Adaptive Reuse, Retrofit

The Stewart Cannery Apartments at Railroad Square

Santa Rosa, CA

A marriage between past and present and celebration of the contextually rich location between the [..]

View Project

Adaptive Reuse, Civic

Yuba County Sheriff Facility

Marysville, CA

This adaptive re-use project entailed re-purposing and improving an existing two-story, tilt-up commercial office building [..]

View Project

Office

3402 Pico Blvd Office Building

Santa Monica, CA

This project at 3402 Pico Boulevard will redevelop an at-grade parking lot into a two-story, [..]

View Project

Transportation

The Mobility Hub at LTCC

South Lake Tahoe, CA

The Mobility Hub at LTCC is part of a broader plan to bring clean transportation [..]

View Project

Seismic Retrofit/Heritage Renovation

Elks Tower Seismic Upgrade

Sacramento, CA

The historic Elks Tower was rehabilitated to showcase retail shops on the first floor while [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.