Orange County

Integrated Care Center Huntington Beach

Integrated Care Center Huntington Beach

The new Integrated Care Center was initiated by Hoag Medical Group to create a more efficient, flexible facility that adapts to the changing healthcare landscape and provides more accessible specialized services to the residents of Huntington Beach. The three-story building offers urgent care, physical therapy, diagnostics, orthopedics, pediatrics, a primary care clinic, an education/wellness center, pharmacy and a comprehensive imaging department. The layout makes the traditional primary care model easier to navigate with amenities such as centralized check-in areas on each floor. Miyamoto provided structural design for the steel-framed medical office building which is located on a high-profile boulevard. The lateral-force resisting system is slotted-web steel moment resisting frames to reduce steel tonnage while providing improved moment-frame performance. The project was also designed to meet LEED-CS certification.

Team Members

No data was found

Client

Boulder Associates (Architect)

Year

2014

Scale

55,000 SF (Core & Shell) 80,000 SF (Tenant Improvements)

Location

Huntington Beach, CA

Integrated Care Center Huntington Beach

The new Integrated Care Center was initiated by Hoag Medical Group to create a more efficient, flexible facility that adapts to the changing healthcare landscape and provides more accessible specialized services to the residents of Huntington Beach. The three-story building offers urgent care, physical therapy, diagnostics, orthopedics, pediatrics, a primary care clinic, an education/wellness center, pharmacy and a comprehensive imaging department. The layout makes the traditional primary care model easier to navigate with amenities such as centralized check-in areas on each floor. Miyamoto provided structural design for the steel-framed medical office building which is located on a high-profile boulevard. The lateral-force resisting system is slotted-web steel moment resisting frames to reduce steel tonnage while providing improved moment-frame performance. The project was also designed to meet LEED-CS certification.

Client

Boulder Associates (Architect)

Year

2014

Scale

55,000 SF (Core & Shell) 80,000 SF (Tenant Improvements)

Location

Huntington Beach, CA

More Projects

Healthcare

UCR Student Health and Counseling Center

Riverside, CA

The UC Riverside’s Student Health & Counseling Center is a new 40,000-SF, two-story structure in [..]

View Project

Helen Caloggero Women’s & Family Center

Orange, CA

Helen Caloggero Women’s & Family Center is a new 137,000-SF medical office building (MOB) that [..]

View Project

Adaptive Reuse, Residential

Oaks Christian School Dormitory

Westlake Village, CA

This three-story office building from the 1980s is being converted to a 220-bed student dormitory, [..]

View Project

MEP

City of Fremont Maintenance Storage Warehouse

Fremont, CA

The team provided electrical engineering services for a prefabricated metal building of approximately 10,000 square [..]

View Project

Industrial

Hakusan Sake Gardens

Napa, CA

Hakusan Sake chose Napa, California as their United States headquarters for the production and warehouse [..]

View Project

Industrial

Good Eggs Tenant Improvement

Oakland, CA

Miyamoto provided tenant improvement services to an existing tilt-up building owned by a grocery delivery [..]

View Project

Save lives, impact economies.