Search
Close this search box.

Orange County

Integrated Care Center Huntington Beach

Integrated Care Center Huntington Beach

The new Integrated Care Center was initiated by Hoag Medical Group to create a more efficient, flexible facility that adapts to the changing healthcare landscape and provides more accessible specialized services to the residents of Huntington Beach. The three-story building offers urgent care, physical therapy, diagnostics, orthopedics, pediatrics, a primary care clinic, an education/wellness center, pharmacy and a comprehensive imaging department. The layout makes the traditional primary care model easier to navigate with amenities such as centralized check-in areas on each floor. Miyamoto provided structural design for the steel-framed medical office building which is located on a high-profile boulevard. The lateral-force resisting system is slotted-web steel moment resisting frames to reduce steel tonnage while providing improved moment-frame performance. The project was also designed to meet LEED-CS certification.

Client

Boulder Associates (Architect)

Year

2014

Scale

55,000 SF (Core & Shell) 80,000 SF (Tenant Improvements)

Location

Huntington Beach, CA

Integrated Care Center Huntington Beach

The new Integrated Care Center was initiated by Hoag Medical Group to create a more efficient, flexible facility that adapts to the changing healthcare landscape and provides more accessible specialized services to the residents of Huntington Beach. The three-story building offers urgent care, physical therapy, diagnostics, orthopedics, pediatrics, a primary care clinic, an education/wellness center, pharmacy and a comprehensive imaging department. The layout makes the traditional primary care model easier to navigate with amenities such as centralized check-in areas on each floor. Miyamoto provided structural design for the steel-framed medical office building which is located on a high-profile boulevard. The lateral-force resisting system is slotted-web steel moment resisting frames to reduce steel tonnage while providing improved moment-frame performance. The project was also designed to meet LEED-CS certification.

Client

Boulder Associates (Architect)

Year

2014

Scale

55,000 SF (Core & Shell) 80,000 SF (Tenant Improvements)

Location

Huntington Beach, CA

More Projects

Entertainment

Disney California Adventure

Anaheim, CA

Disney California Adventure underwent a massive renovation from 2007 to 2012, bringing new attractions and [..]

View Project

OfficeTilt-Up

The Press Sunflower Addition

Costa Mesa, CA

Miyamoto Internati onal provided structural engineering services for the expansion of the Los Angeles Times’ [..]

View Project

Education

Casa Roble High School Administration, Student Union and CTE Modernization

Orangevale, CA

This progressive design-build project at Casa Roble High School demolished the existing Administration and Library [..]

View Project

Residential

Cabrillo Towers

Santa Ana, CA

This site was underlain with soft soils at a deep stratum to mitigate the financial [..]

View Project

Lab and Science

California State University, Sacramento Placer Hall

Sacramento, CA

Miyamoto provided structural engineering services for this five-story science classroom building built at a time [..]

View Project

CommercialHospitality

Washington Family Ranch Expansion

The Washington Family Ranch in Central Oregon is one of 25 Young Life camps in the [..]

View Project

Save lives, impact economies.