Search
Close this search box.

Keystone West Business Park

Keystone West Business Park

Keystone West Business Park is an 820,000-SF, LEED-Gold distribution center for W.W. Grainger, Inc. The facility incorporates a two-story, 40,000-SF office area with 780,000 square feet devoted to warehouse and distribution operations. The facility utilizes concrete tilt-wall panels, offers 32’ clearance height and includes a picking/conveyer system and high-density racking. The site provides 187 trailer parking spaces with additional surface parking for 410 cars.

Client

McShane Construction Company

Year

2007

Scale

820,000 SF

Location

Patterson, CA

Keystone West Business Park

Keystone West Business Park is an 820,000-SF, LEED-Gold distribution center for W.W. Grainger, Inc. The facility incorporates a two-story, 40,000-SF office area with 780,000 square feet devoted to warehouse and distribution operations. The facility utilizes concrete tilt-wall panels, offers 32’ clearance height and includes a picking/conveyer system and high-density racking. The site provides 187 trailer parking spaces with additional surface parking for 410 cars.

Client

McShane Construction Company

Year

2007

Scale

820,000 SF

Location

Patterson, CA

More Projects

High-RiseResidential

Jasper

San Francisco, CA

Jasper is a 430-foot (130m) residential skyscraper located at 45 Lansing Street in the Rincon [..]

View Project

MEP

HumanGood Skilled Nursing Facility

Los Gatos, CA

Miyamoto International (formerly ATI Engineers) replaced two indoor cooling towers that had catastrophically failed by [..]

View Project

Parking

California State University Sacramento, Parking Structure II

Sacramento, CA

California State University, Sacramento is primarily a commuter school so vertical parking structures met demand [..]

View Project

EducationSeismic Rehabilitation

UCR Chapman Hall Seismic Assessment

Riverside, CA

Miyamoto International performed a seismic evaluation of Chapman Hall, a 2-story concrete building constructed in [..]

View Project

CivicEducation

Justin Siena Library

Napa, CA

This 8,000-SF facility serves as a new library and resource media center for the Justin [..]

View Project

Adaptive ReuseRetrofit

Antler Hotel, Historic and Seismic Rehabilitation

Lemoore, CA

This two-story, unreinforced masonry (URM) building with a partial basement is located in the heart [..]

View Project

Save lives, impact economies.