Search
Close this search box.

LAUSD North Wellness Center

LAUSD North Wellness Center

Miyamoto provided structural engineering services for the construction of two new school-based Clinic and Wellness Center buildings located at Balboa Blvd. Mental Health Center (MHS) and Charles Maclay Middle School. The new buildings are 4,800 square feet (Balboa) and 5,100 square feet (Maclay). The structural system used in the two buildings is made of a bare metal deck supported by metal stud joists, metal stud box beams and metal stud walls. The seismic force-resisting system is sure-board metal stud walls. Both buildings featured distinctive geometries in plan and elevation, with canopies, mechanical wells, multiple roof levels and equipment screens integrated into the primary structure. Miyamoto worked closely with the architects and carefully detailed the structure to ensure that these features could be fully realized without resorting to costly field welding.

Client

IBI Group

Year

2020

Scale

9,900 SF

Location

Los Angeles, CA

LAUSD North Wellness Center

Miyamoto provided structural engineering services for the construction of two new school-based Clinic and Wellness Center buildings located at Balboa Blvd. Mental Health Center (MHS) and Charles Maclay Middle School. The new buildings are 4,800 square feet (Balboa) and 5,100 square feet (Maclay). The structural system used in the two buildings is made of a bare metal deck supported by metal stud joists, metal stud box beams and metal stud walls. The seismic force-resisting system is sure-board metal stud walls. Both buildings featured distinctive geometries in plan and elevation, with canopies, mechanical wells, multiple roof levels and equipment screens integrated into the primary structure. Miyamoto worked closely with the architects and carefully detailed the structure to ensure that these features could be fully realized without resorting to costly field welding.

Client

IBI Group

Year

2020

Scale

9,900 SF

Location

Los Angeles, CA

More Projects

Commercial

Sky Mirror

Dallas, TX

Miyamoto International was called in to construct new, as-built structural drawings for the 23-ton, 35-foot-diameter, [..]

View Project

ResidentialRetailRetrofitSeismic Retrofit/Heritage Renovation

Globe Mills

Sacramento, CA

Globe Mills was built in the late 1800s and included a flour mill, barley [..]

View Project

CivicParking

Madera County Government Center and Parking Structure

Madera, CA

Miyamoto provided structural design services to this 4-story, 130,300-SF governmental office and courthouse building and [..]

View Project

West Covina Unified School District Edgewood High School Aquatic Center

West Covina, CA

Miyamoto provided structural engineering services for this new aquatic facility for West Covina Unified School [..]

View Project

MEP

HumanGood Skilled Nursing Facility

Los Gatos, CA

Miyamoto International (formerly ATI Engineers) replaced two indoor cooling towers that had catastrophically failed by [..]

View Project

AviationCommercial

John Wayne Airport Maintenance Building, Design Build

Costa Mesa, CA

Miyamoto designed a new maintenance facility for John Wayne Airport. This structure is a 24,882-SF [..]

View Project

Save lives, impact economies.