Search
Close this search box.

LinkedIn Headquarters

LinkedIn Headquarters

Recently completed with Gensler, this 26-story offi ce tower is the San Francisco headquarters for LinkedIn. The building offers 450,000+ SF of offi ce space, 2,209 SF of retail space, 8,500 SF of public space that is accessible to the public during working hours and two underground parking levels. Engineering on the building, which some describe as “severe yet sleek,” involved challenges such as exterior columns at the 17th level were transferred to accommodate the city’s setback requirement, yet maximize usable area at the owner’s request. A bent-beam design in the public space created support for the step/sitting area, and allows for a major mechanical duct without headroom issues. Engineering for the TI for LinkedIn, included vibration control for the Level 2 Fitness Center, floor framing upgrades for Level 3 and a Grand Staircase connecting Levels 1 and 3. The scale and angle of the glassy building allows for vivid reflections of the surrounding Second Street neighborhood.

The lateral system is steel BRB & EBF core with steel moment frames. The building lateral design utilized the Tall Building Guidelines and performed peer review process by a third party as required by the city of San Francisco.

  • Staff Experience Project

Client

Gensler,
Thomas Phifer and Partners

Year

2016

Scale

452,418 SF

Location

San Francisco, CA

LinkedIn Headquarters

Recently completed with Gensler, this 26-story offi ce tower is the San Francisco headquarters for LinkedIn. The building offers 450,000+ SF of offi ce space, 2,209 SF of retail space, 8,500 SF of public space that is accessible to the public during working hours and two underground parking levels. Engineering on the building, which some describe as “severe yet sleek,” involved challenges such as exterior columns at the 17th level were transferred to accommodate the city’s setback requirement, yet maximize usable area at the owner’s request. A bent-beam design in the public space created support for the step/sitting area, and allows for a major mechanical duct without headroom issues. Engineering for the TI for LinkedIn, included vibration control for the Level 2 Fitness Center, floor framing upgrades for Level 3 and a Grand Staircase connecting Levels 1 and 3. The scale and angle of the glassy building allows for vivid reflections of the surrounding Second Street neighborhood.

The lateral system is steel BRB & EBF core with steel moment frames. The building lateral design utilized the Tall Building Guidelines and performed peer review process by a third party as required by the city of San Francisco.

  • Staff Experience Project

Client

Gensler,
Thomas Phifer and Partners

Year

2016

Scale

452,418 SF

Location

San Francisco, CA

More Projects

IndustrialWarehouse & Distribution

Kikkoman

Folsom, CA

Kikkoman opened its second United States manufacturing plant in Folsom, California. What they needed was [..]

View Project

Transportation

Metro Gateway Plaza

Los Angeles, CA

Miyamoto provided structural engineering for the Metro Gateway Plaza, the major multi-modal transportation terminal serving [..]

View Project

CivicEducation

Northridge Library

Northridge, CA

This library is a 13,000 square foot replacement library for the Northridge community. The building [..]

View Project

Miyamoto Protek

Catholic Relief Services Turkey Earthquake Response

Gaziantep, Turkey

The CRS Turkey Earthquake Response project aims to provide rapid and sustainable emergency shelter solutions [..]

View Project

RetailSustainability

Hot Italian Restaurant

Sacramento, CA

Hot Italian, the ‘green’ pizza and panini restaurant and Italian clothing boutique, is part of [..]

View Project

MEP

City of Fremont Maintenance Storage Warehouse

Fremont, CA

The team provided electrical engineering services for a prefabricated metal building of approximately 10,000 square [..]

View Project

Save lives, impact economies.