Search
Close this search box.

Loma Linda University Medical Office Building

Loma Linda University Medical Office Building

This project is the result of a partnership between Loma Linda University and Social Action Community Health Services (SACHS), a Federally Qualified Health Center (FQHC). This 150,000-SF, three-story medical office building houses a health clinic operated by SACHS that includes urgent and dental care, family and adult medicine, pediatric clinical pods, imaging, a laboratory, and a pharmacy. As an extension of Loma Linda University, one of the project goals was to become the first LEED-certified building within the university’s network of facilities, which is why it was designed as a LEED-certified showpiece, intended to beautify the downtown area with trees and gardens that promote healing and a sense of community. Due to the team’s work, the project met this goal and gained a LEED Silver rating. Lastly, Miyamoto managed to reduce construction costs by using concrete tilt-up walls for the structural system and as the building’s exterior envelope.

Client

Boulder Associates Architects

Year

2016

Scale

150,000 SF

Location

San Bernardino, CA

Loma Linda University Medical Office Building

This project is the result of a partnership between Loma Linda University and Social Action Community Health Services (SACHS), a Federally Qualified Health Center (FQHC). This 150,000-SF, three-story medical office building houses a health clinic operated by SACHS that includes urgent and dental care, family and adult medicine, pediatric clinical pods, imaging, a laboratory, and a pharmacy. As an extension of Loma Linda University, one of the project goals was to become the first LEED-certified building within the university’s network of facilities, which is why it was designed as a LEED-certified showpiece, intended to beautify the downtown area with trees and gardens that promote healing and a sense of community. Due to the team’s work, the project met this goal and gained a LEED Silver rating. Lastly, Miyamoto managed to reduce construction costs by using concrete tilt-up walls for the structural system and as the building’s exterior envelope.

Client

Boulder Associates Architects

Year

2016

Scale

150,000 SF

Location

San Bernardino, CA

More Projects

Mixed-use

Skypointe Reno

Reno, NV

Skypointe is a mixed-use, office/retail development, providing restaurants and retail amenities to office users within [..]

View Project

Lab and Science

Mercy Oncology Center

Sacramento, CA

Miyamoto International was part of the team that converted this building, previously occupied by the [..]

View Project

Office

Orange County Transportation Authority Transit Security and Operations Center

Anaheim, CA

Miyamoto is providing structural engineering services for the two-story, 32,000-square-foot OCTA Transit Security and Operati [..]

View Project

Civic

Los Angeles Police Department Harbor Station and Jail

Los Angeles, CA

The LAPD Harbor Station and Jail complex features a new two-story police station and 16,000-sf [..]

View Project

IndustrialTilt-UpWarehouse & Distribution

Cherry Logistics Center

Newark, CA

This project consists of a new single-multi-tenant industrial speculative facility located on a 29-acre site. [..]

View Project

Transportation

Gold Coast Transit

Oxnard, CA

Miyamoto International was the structural engineer for this new facility, which included a 17,000-SF administration [..]

View Project

Save lives, impact economies.