Search
Close this search box.

Marina Gateway Industrial Center

Marina Gateway Industrial Center

Marina Gateway Industrial Center was built as a 294,000-SF speculative project on 13 acres with 32-foot clearances, but it was leased to Italian syrup maker Torani during construction. As a result, Miyamoto was contracted to build a new 36,000-SF office mezzanine to support the corporate headquarters. Miyamoto worked closely with a general contractor, KPRS, to ensure construction continued smoothly while build-to-suit requirements for Torani were engineered.

Client

Overton Moore Properties

Year

2018

Scale

294,000 SF

Location

San Leandro, CA

Marina Gateway Industrial Center

Marina Gateway Industrial Center was built as a 294,000-SF speculative project on 13 acres with 32-foot clearances, but it was leased to Italian syrup maker Torani during construction. As a result, Miyamoto was contracted to build a new 36,000-SF office mezzanine to support the corporate headquarters. Miyamoto worked closely with a general contractor, KPRS, to ensure construction continued smoothly while build-to-suit requirements for Torani were engineered.

Client

Overton Moore Properties

Year

2018

Scale

294,000 SF

Location

San Leandro, CA

More Projects

IndustrialTilt-Up

Otay Logistics Center

Otay Mesa, CA

Otay Logistics Center is a 15-acre site in San Diego consisting of two industrial buildings. [..]

View Project

Lab and Science

Millipore Sigma

Carlsbad, CA

Millipore Sigma consists of a new manufacturing facility to support viral and gene therapy production. [..]

View Project

High-Rise

Exchange 106

Kuala Lumpur, Malaysia

The 106-story “Exchange 106” supertall high-rise in Malaysia will be the world’s 15th-tallest building. At [..]

View Project

Transportation

Caltrans District 7 Operations & Maintenance Replacement Facility

Sylmar, CA

This maintenance and replacement facility is an elegant combination of open-web steel joists, structural steel [..]

View Project

DOD/Federal

U.S. Post Office & Federal Building Seismic Rehabilitation

Sacramento, CA

When the Federal Building required rehabilitation to improve its seismic resistance and sustainability over time, [..]

View Project

CommercialIndustrialTilt-UpWarehouse & Distribution

Redlands Logistic Center

Redlands, CA

The Redlands Logistic Center is a more than one million square-foot, LEED-Silver facility in Redlands, [..]

View Project

Save lives, impact economies.