Search
Close this search box.
Search
Close this search box.

Marmaray Tube Project

Marmaray Tube Project

Miyamoto Turkey provided a geotechnical and structural design for the system selection for the dry docks. This included a dock gate for the construction of the tube sections and an assessment of the rock anchors of the jetty structure to be located in offshore Üsküdar for the Marmaray Tube Crossing Project. The completed project represented the first physical rail link between Europe and Asia.

Team Members

No data was found

Client

Taisei Corporation

Year

2005

Scale

-

Location

Istanbul, Turkey

Marmaray Tube Project

Miyamoto Turkey provided a geotechnical and structural design for the system selection for the dry docks. This included a dock gate for the construction of the tube sections and an assessment of the rock anchors of the jetty structure to be located in offshore Üsküdar for the Marmaray Tube Crossing Project. The completed project represented the first physical rail link between Europe and Asia.

Client

Taisei Corporation

Year

2005

Scale

-

Location

Istanbul, Turkey

More Projects

Adaptive Reuse, Mixed-use, Residential, Retrofit

The Hotel Woodland

Woodland, CA

The Hotel Woodland, which is included in the National Historic Preservation Registry, was rehabilitated to [..]

View Project

Mixed-use, Residential

Pearson’s Building

Woodland, CA

This two-story, unreinforced brick masonry building was built in 1875 on downtown Woodland’s historic Main [..]

View Project

Education

Southwestern College Institutional Technology Building

Chula Vista, CA

The Southwestern Community College Institutional Technology building is designed to support student life on campus, [..]

View Project

Civic

Los Angeles Police Academy Training Facility

City of Los Angeles, RNL Design

The Los Angeles Police Academy Training Center consists of four one-and two-story reinforced concrete shear [..]

View Project

Mixed-use, Residential

6041 Variel Avenue

Woodland Hills, CA

This project consists of two phases. The first phase is a 7-story mixed-use development, including [..]

View Project

Industrial, Tilt-Up

3M Manufacturing

Irvine, Monrovia, Oak Hills and Northridge, CA

Miyamoto International performed ASCE 41-13 seismic risk mitigation cost-benefit analyses to understand the exposure to [..]

View Project

Save lives, impact economies.