In November 2011, the 101-year old Masterton Courthouse was closed — deemed unsafe to the public due to the risk of collapse in the event of an earthquake. The 900m2 building required strengthening to 100% NBS and re-roofing. General reconfiguration and refurbishment also was needed to bring the building up to modern standards and allow it to reopen for public use. A structural design had been proposed.

In January 2012, the Ministry of Justice began working with Miyamoto International NZ (formerly Miyamoto Impact) to project manage the building’s earthquake strengthening and refurbishment. When appointed, we recognized that the structural design being proposed was a very costly option – almost on par with demolishing the existing building and constructing a new courthouse. A peer review was recommended to assess if the proposed design represented the best solution for the Ministry. This review resulted in a new design that would half the cost and complete the work in a shorter time frame.

The Ministry approved the budget for the project and we proceeded with appointing the full design team. A part of our role was to collate the requirements from the different Ministry stakeholders into a brief that clearly articulated all their requirements. This brief meant the designers were fully informed from the outset. In addition, a clear scope of services and appointments for all consultants was provided, avoiding the need for additional fees. Seismic technologies deployed to upgrade the building included a seismic retrofit. This used fibre reinforced polymer (FRP) for both in plane and out of plane unreinforced masonry. Performance-based methods (alternate analysis methods) were used to justify existing unreinforced wall out of plane capacity. This eliminated costly wall strengthening.

Learnings from New Zealand and Miyamoto International’s Los Angeles and Milan offices were used in the project’s analysis and retrofit to deliver added value to the Ministry. Throughout the project, we provided clear leadership. This saw the right design team being appointed, costs controlled and a tender process that got the best outcome for the Ministry. By suggesting a peer review, Miyamoto International NZ’s initiative allowed the Ministry to save 50% on the previous design and saw the Courthouse reopen in early June 2013, ahead of the original timeframe.

Team Members

No data was found

Client

Ministry of Justice
NZ Government

Year

2013

Scale

-

Location

Masterton, Wairarapa

Masterton Courthouse

In November 2011, the 101-year old Masterton Courthouse was closed — deemed unsafe to the public due to the risk of collapse in the event of an earthquake. The 900m2 building required strengthening to 100% NBS and re-roofing. General reconfiguration and refurbishment also was needed to bring the building up to modern standards and allow it to reopen for public use. A structural design had been proposed.

In January 2012, the Ministry of Justice began working with Miyamoto International NZ (formerly Miyamoto Impact) to project manage the building’s earthquake strengthening and refurbishment. When appointed, we recognized that the structural design being proposed was a very costly option – almost on par with demolishing the existing building and constructing a new courthouse. A peer review was recommended to assess if the proposed design represented the best solution for the Ministry. This review resulted in a new design that would half the cost and complete the work in a shorter time frame.

The Ministry approved the budget for the project and we proceeded with appointing the full design team. A part of our role was to collate the requirements from the different Ministry stakeholders into a brief that clearly articulated all their requirements. This brief meant the designers were fully informed from the outset. In addition, a clear scope of services and appointments for all consultants was provided, avoiding the need for additional fees. Seismic technologies deployed to upgrade the building included a seismic retrofit. This used fibre reinforced polymer (FRP) for both in plane and out of plane unreinforced masonry. Performance-based methods (alternate analysis methods) were used to justify existing unreinforced wall out of plane capacity. This eliminated costly wall strengthening.

Learnings from New Zealand and Miyamoto International’s Los Angeles and Milan offices were used in the project’s analysis and retrofit to deliver added value to the Ministry. Throughout the project, we provided clear leadership. This saw the right design team being appointed, costs controlled and a tender process that got the best outcome for the Ministry. By suggesting a peer review, Miyamoto International NZ’s initiative allowed the Ministry to save 50% on the previous design and saw the Courthouse reopen in early June 2013, ahead of the original timeframe.

Client

Ministry of Justice
NZ Government

Year

2013

Scale

-

Location

Masterton, Wairarapa

More Projects

Entertainment

The Park at 410 Blvd

Burlingame, CA

A vacant nine-acre property at 410 Blvd is planned to be turned into a natural [..]

View Project

Residential

The Edison

Reno, NV

The Edison marries sophistication and sustainability as Reno’s newest luxury community. As consumers adapt to [..]

View Project

Education

Estancia High School Aquatic Center

Costa Mesa, CA

The Estancia High School Aquatic Center received a complete make-over, much to the excitement and [..]

View Project

Aviation

LAX Bradley West Enabling Projects

Los Angeles, CA

As part of the $1.3 billion LAX BradleyWest Expansion project, Miyamoto played a vital role in [..]

View Project

Industrial, Tilt-Up

Otay Logistics Center

Otay Mesa, CA

Otay Logistics Center is a 15-acre site in San Diego consisting of two industrial buildings. [..]

View Project

Hospitality

The Westin (formerly Le Rivage)

Sacramento, CA

Located alongside the Sacramento River just two miles from downtown and the State Capitol Building, [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.