Matahari Terbit Jewelry Factory & Campus Expansion

Matahari Terbit Jewelry Factory & Campus Expansion

When Matahari Terbit expanded its jewelry manufacturing operations onto adjacent land, it called on Miyamoto Italia to develop the structural schematic designs for a production building, residential building, guest house, villas, shop building and other service buildings. During this expansion, the company also worked to reinvent its brand through architecture, along with a radical transformation of production strategies, business and communication. The concept behind the expansion was a “garden style” factory. Inside, large windows protect from the sun’s rays while a landscape imbued with water and greenery is a strong and powerful element. Engineering challenges included creating a seismic design in an area at high risk of earthquakes utilizing the Indonesia seismic code.

Team Members

No data was found

Client

BITECO / Matahari Terbit

Year

2014

Scale

20,000 SM (215,000 SF)

Location

Bandung, Indonesia

Matahari Terbit Jewelry Factory & Campus Expansion

When Matahari Terbit expanded its jewelry manufacturing operations onto adjacent land, it called on Miyamoto Italia to develop the structural schematic designs for a production building, residential building, guest house, villas, shop building and other service buildings. During this expansion, the company also worked to reinvent its brand through architecture, along with a radical transformation of production strategies, business and communication. The concept behind the expansion was a “garden style” factory. Inside, large windows protect from the sun’s rays while a landscape imbued with water and greenery is a strong and powerful element. Engineering challenges included creating a seismic design in an area at high risk of earthquakes utilizing the Indonesia seismic code.

Client

BITECO / Matahari Terbit

Year

2014

Scale

20,000 SM (215,000 SF)

Location

Bandung, Indonesia

More Projects

Residential

Falkirk Apartments

Riverside, CA

Miyamoto International conducted structural evaluations on 19 two-story wood residential apartment buildings and several single-story [..]

View Project

Education

San Leandro High School Gymnasium

San Leandro, CA

In 2024, the San Leandro Unified School District welcomed this new, $67-million gymnasium in San [..]

View Project

Retail

Nugget Market

Highland Park Plaza, Roseville, CA

At Nugget Market, nothing is as important as a high-quality product at a low price, [..]

View Project

Adaptive Reuse, Commercial, Office, Sustainability

Architectural Nexus Office Renovation, LEED Double Platinum

Sacramento, CA

Architectural Nexus’ adaptive reuse of an existing building resulted in a newly renovated office building [..]

View Project

Retrofit

The Traveler’s Hotel

Sacramento, CA

The Traveler’s Hotel, built in the 1920s, is a 106,000-SF, seven-story, non-ductile, concrete building. In [..]

View Project

Commercial

Maui Brewing Company

Kīhei, HI

Miyamoto provided the structural design for the two-story, 35,000-SF brewery and restaurant building in Kihei, [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.