Metro Gold Line Parking Facilities

Project Location: Various in Southern California

Metro Gold Line Parking Facilities

Location:

Various in Southern California

Year:

2015

Client:

Metro Gold Line Authority

Scale:

Monrovia – 365
Irwindale – 350
Arcadia – 300
Azusa – 200

Miyamoto International worked closely with team members led by the IBI Group to develop conceptual designs and construction budgets for four unique parking structures serving adjacent Metro Gold Line transit stations. The Advanced Conceptual Engineering (ACE) package was then issued to prospective Design/Builders who completed the final design and construction of the facilities. Periodic meetings were held with LA Metro Line Authority and our team to review the overall design and validate the construction budget. Efficient and productive communication was paramount, ensuring continuity of design between the structural, electrical and mechanical teams. Stall counts in each facility varied per location according to position along the Metro Gold Line route from Pasadena extending eastward to Azusa.

400+

Listing

120+

location

1,022

client

150+

project planing

Project Gallery

Here, we showcase a diverse range of innovative and inspiring projects from various fields. From art and design to technology and science, our gallery offers a glimpse into the creativity and ingenuity of talented individuals and teams.

testimonials

What People Say About Us

Like what you see?