Midpoint @ 237

Midpoint@237 is a 57-acre, LEED-certified project in San Jose’s Alviso district. The property is designed as a manufacturing hub to attract clean-tech companies focused on high-tech manufacturing. The site is at North First Street and Nortech Parkway with prominent Highway 237 visibility. The office complex includes loading docks with grade-level loading platforms. Demand for big spaces catering to advanced manufacturing and research has grown in the Silicon Valley amid the region’s leasing boom and reduced the inventory of these types of buildings.

The first phase of the project includes three manufacturing buildings totaling 564,000 square feet. Phase Two includes two 83,000-SF, two-story buildings and two 124,000-SF, three-story buildings that house offices and research and development facilities. The Silicon Valley Business Journal voted the project its 2016 Industrial Project of the Year and noted that it was the 3rd largest construction project in San Jose in 2017.

Awards

Industrial Project of the Year, Silicon Valley Business Journal

Team Members

No data was found

Client

Arc Tec, Inc.

Year

-

Scale

Phase One: 3 Buildings: 564,000 SF Phase Two: 2 Buildings: 83,000 SF, 2 Buildings: 124,000 SF

Location

San Jose, CA

Midpoint @ 237

Midpoint@237 is a 57-acre, LEED-certified project in San Jose’s Alviso district. The property is designed as a manufacturing hub to attract clean-tech companies focused on high-tech manufacturing. The site is at North First Street and Nortech Parkway with prominent Highway 237 visibility. The office complex includes loading docks with grade-level loading platforms. Demand for big spaces catering to advanced manufacturing and research has grown in the Silicon Valley amid the region’s leasing boom and reduced the inventory of these types of buildings.

The first phase of the project includes three manufacturing buildings totaling 564,000 square feet. Phase Two includes two 83,000-SF, two-story buildings and two 124,000-SF, three-story buildings that house offices and research and development facilities. The Silicon Valley Business Journal voted the project its 2016 Industrial Project of the Year and noted that it was the 3rd largest construction project in San Jose in 2017.

Awards

Industrial Project of the Year, Silicon Valley Business Journal

Client

Arc Tec, Inc.

Year

-

Scale

Phase One: 3 Buildings: 564,000 SF Phase Two: 2 Buildings: 83,000 SF, 2 Buildings: 124,000 SF

Location

San Jose, CA

More Projects

Healthcare

Carson Tahoe Hospital Expansion

Carson City, NV

This Carson Tahoe Hospital project was an especially challenging expansion that encompassed three phases. At [..]

View Project

Industrial, Tilt-Up

Northgate Business Park Building 3

North Las Vegas, NV

Miyamoto was the engineer on this 813,120-SF, single-story facility in North Las Vegas serving as [..]

View Project

Adaptive Reuse, Civic

Yuba County Sheriff Facility

Marysville, CA

This adaptive re-use project entailed re-purposing and improving an existing two-story, tilt-up commercial office building [..]

View Project

Hospitality, Sustainability

Miyako Hybrid Hotel

Torrence, CA

The Miyako Hybrid Hotel is an eight-story, 209-room, eco-friendly boutique hotel and spa in Torrance [..]

View Project

Civic, Retrofit, Seismic Retrofit/Heritage Renovation

Santa Clarita City Hall

Santa Clarita, California

The seismic retrofit of the existing 1980s, three-story Santa Clarita City Hall included the installation [..]

View Project

Residential

Upper Eastside Loft

Sacramento, CA

Located within minutes from the university, the Upper Eastside Lofts fulfills the campus’s need to [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.