Miyamoto provided the structural design for this underground railway station. Measuring at 400 meters long and 45 meters wide, this structure will boast a connected walkway to the existing terminal and a steel car park. It will also have structures running along the three-kilometer long train tunnel that will be constructed with a “cut and cover” system of which is already located in the urbanized area near Terminal 2 of the airport.
Technital SpA
2012
Parking structure: 30,000 Square Meters
Station 45,000m3 (240,000m3)
Milan, Italy
Miyamoto provided the structural design for this underground railway station. Measuring at 400 meters long and 45 meters wide, this structure will boast a connected walkway to the existing terminal and a steel car park. It will also have structures running along the three-kilometer long train tunnel that will be constructed with a “cut and cover” system of which is already located in the urbanized area near Terminal 2 of the airport.
Technital SpA
2012
Parking structure: 30,000 Square Meters
Station 45,000m3 (240,000m3)
Milan, Italy
Subscribe to learn about new the latest in engineering news, solutions, and updates.
We care about your data in our privacy policy.