Millipore Sigma

Millipore Sigma

Millipore Sigma consists of a new manufacturing facility to support viral and gene therapy production. The facility was constructed within an existing shell building for production at the 1000-liter scale using proprietary single-use equipment. This phase includes 11 new viral vector manufacturing labs, warehouse space, offices, equipment mezzanine and a utility yard for support. Miyamoto provided the structural design for the main equipment mezzanine platform, a steel-frame structure topped with corrugated concrete over metal deck. Additionally, structural design support was provided for various MEP units and distribution lines throughout the project, including cooling towers, generators, pumps, chillers and chilled water lines. Millipore Sigma Laboratory Expansion

Team Members

No data was found

Client

CE&IC

Year

2021

Scale

140,000 SF

Location

Carlsbad, CA

Millipore Sigma

Millipore Sigma consists of a new manufacturing facility to support viral and gene therapy production. The facility was constructed within an existing shell building for production at the 1000-liter scale using proprietary single-use equipment. This phase includes 11 new viral vector manufacturing labs, warehouse space, offices, equipment mezzanine and a utility yard for support. Miyamoto provided the structural design for the main equipment mezzanine platform, a steel-frame structure topped with corrugated concrete over metal deck. Additionally, structural design support was provided for various MEP units and distribution lines throughout the project, including cooling towers, generators, pumps, chillers and chilled water lines. Millipore Sigma Laboratory Expansion

Client

CE&IC

Year

2021

Scale

140,000 SF

Location

Carlsbad, CA

More Projects

Pajaro Valley High School Playfields

Watsonville, CA

The Pajaro Valley High School (PVHS) Playfields are not just an essential upgrade but a [..]

View Project

Civic

County of San Diego Juvenile Justice Facility

San Diego

The Juvenile Justice Campus phase 1 is a partial replacement for the existing Juvenile Hall [..]

View Project

Parking

C3 Office Parking Structure

Culver City, CA

The C3 parking structure is a new 9-level, 1,010-stall high-rise parking structure designed by Miyamoto [..]

View Project

Retail

722 S. Broadway Building Adaptive Reuse

Los Angeles, CA

The 722 S. Broadway Building is an adaptive reuse and seismic upgrade of an existing [..]

View Project

Lab and Science

The North Medical Office Building and Ambulatory Surgery Center

Yuba City, CA

The North Medical Office Building and Ambulatory Surgery Center, a two-story, 40,000-SF steel-framed structure, is [..]

View Project

Civic

North Natomas Community Center

Sacramento, CA

The Natomas Aquatic Complex is the first Olympic-size, 50-meter pool for the City of Sacramento [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.