MW FEP Factory

Miyamoto International Italia designed the seismic strengthening of this precast concrete production building and a 3-story concrete frame office building. The requested performance level was achieved with high-performance earthquake engineering solutions, such as fluid viscous dampers, shock transmitters and buckling restrained braced frames. The roof diaphragm of the production building was improved by adding new steel braces. The innovative design resulted in superior building performance under seismic actions, which has proven to be costeffective. Miyamoto also performed the construction-works supervision.

Team Members

No data was found

Client

MW FEP

Year

2015

Scale

5,000 Square Meters

Location

S.G. Persiceto, Italy

MW FEP Factory

Miyamoto International Italia designed the seismic strengthening of this precast concrete production building and a 3-story concrete frame office building. The requested performance level was achieved with high-performance earthquake engineering solutions, such as fluid viscous dampers, shock transmitters and buckling restrained braced frames. The roof diaphragm of the production building was improved by adding new steel braces. The innovative design resulted in superior building performance under seismic actions, which has proven to be costeffective. Miyamoto also performed the construction-works supervision.

Client

MW FEP

Year

2015

Scale

5,000 Square Meters

Location

S.G. Persiceto, Italy

More Projects

Religious

Straw Bale Retreat, Sister of the Holy Names

The Sisters of the Holy Names have created several retreats for spiritual rejuvenation, and they [..]

View Project

Parking

C3 Office Parking Structure

Culver City, CA

The C3 parking structure is a new 9-level, 1,010-stall high-rise parking structure designed by Miyamoto [..]

View Project

Burlingame Park at 410 Airport Blvd Phase 1B

Burlingame, CA

A vacant nine-acre property at 410 Blvd is planned to be turned into a natural [..]

View Project

Education, Sustainability

Los Angeles City College Student Union

Los Angeles, CA

Los Angeles City College (LACC) partnered with Miyamoto’s design-build team to develop a new student [..]

View Project

Seismic Retrofit/Heritage Renovation

Elks Tower Seismic Upgrade

Sacramento, CA

The historic Elks Tower was rehabilitated to accommodate retail space on the first floor and [..]

View Project

Retail

722 S. Broadway Building Adaptive Reuse

Los Angeles, CA

The 722 S. Broadway Building is an adaptive reuse and seismic upgrade of an existing [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.