Retained by the government of Haiti, Miyamoto International conducted damage surveys of Haiti’s National Palace to assess severe damage resulting from the magnitude 7.0 earthquake on January 12, 2010.  Composed of unreinforced masonry and nonductile concrete frames, which have not performed well during past seismic events, the National Palace was three times the size of the U.S. White House and shaped like the letter E.

The upper floor and the front wing collapsed in the 2010 earthquake and Miyamoto was retained almost immediately to investigate the following: 1. Magnitude of damage. 2. Safety path to retrieve important national documents. 3. Feasibility of repairing the structure. Our in-depth field investigation and analysis revealed that this national historic building could be salvaged and repaired economically. While our findings were initially used to strategize the repair and reconstruction of the building and France offered to fund the rebuilding, the government ultimately decided to tear the French Renaissance-inspired structure built in 1920 down.  

Team Members

No data was found

Client

-

Year

2010

Scale

463,561 SF

Location

Port-au-Prince, Haiti

National Palace of the Republic of Haiti

Retained by the government of Haiti, Miyamoto International conducted damage surveys of Haiti’s National Palace to assess severe damage resulting from the magnitude 7.0 earthquake on January 12, 2010.  Composed of unreinforced masonry and nonductile concrete frames, which have not performed well during past seismic events, the National Palace was three times the size of the U.S. White House and shaped like the letter E.

The upper floor and the front wing collapsed in the 2010 earthquake and Miyamoto was retained almost immediately to investigate the following: 1. Magnitude of damage. 2. Safety path to retrieve important national documents. 3. Feasibility of repairing the structure. Our in-depth field investigation and analysis revealed that this national historic building could be salvaged and repaired economically. While our findings were initially used to strategize the repair and reconstruction of the building and France offered to fund the rebuilding, the government ultimately decided to tear the French Renaissance-inspired structure built in 1920 down.  

Client

-

Year

2010

Scale

463,561 SF

Location

Port-au-Prince, Haiti

More Projects

Adaptive Reuse, Commercial, Mixed-use, Retrofit, Seismic Retrofit/Heritage Renovation

Criterion Theater

Santa Monica, CA

Miyamoto provided structural engineering to the redevelopment of two adjacent buildings, the Criterion Residential Building [..]

View Project

Lab and Science

Mercy Oncology Center

Sacramento, CA

Miyamoto International was part of the team that converted this building, previously occupied by the [..]

View Project

Parking

California State University Sacramento, Parking Structure II

Sacramento, CA

California State University, Sacramento is primarily a commuter school so vertical parking structures met demand [..]

View Project

Education

Napa Hall, CSU Sacramento

Sacramento, CA

Napa Hall is the 34,000-SF home of California State University, Sacramento’s College of Continuing Education. [..]

View Project

MEP

City of Fremont Maintenance Storage Warehouse

Fremont, CA

The team provided electrical engineering services for a prefabricated metal building of approximately 10,000 square [..]

View Project

Lab and Science

The Gateway Science Museum

Chico, CA

Showcases the natural diversity and geologic history of Northern California. Provides university faculty and students [..]

View Project

Save lives, impact economies.

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.