Search
Close this search box.
Search
Close this search box.

San Diego

Nissan-Infinity Parking Structure Downtown LA

Nissan-Infinity Parking Structure Downtown LA

Miyamoto provided the structural design of the Nissan-Infinity Parking Structure, a 10-level, 668,551-SF multi-use building. Aiming for the commercial redevelopment of the southern half of a city block, the structure houses a showroom, repair-shop, storage area and public parking. Levels five and up are reserved for private use while the levels below contain a Nissan/Infiniti automotive dealershipโ€”public parking and vehicle storage are limited to levels one and two. Due to site constraints and a Mercedes Benz building, which is adjacent to the project site, the team had to create unique design solutions under a very fast design and construction schedule. Miyamoto had originally designed a full-level deep transfer girder above the existing Mercedes building but quickly redesigned the structure to remove it during the foundation construction due to the fire rating of the existing building. Furthermore, the constraints presented a unique challenge to shoring and foundation installment, and property lines demanded offset foundations on three sides of the building.

Client

Sparc Plus, LLC.

Year

2023

Scale

668,551 Square Feet 1577 Stalls

Location

Los Angeles, CA

Nissan-Infinity Parking Structure Downtown LA

Miyamoto provided the structural design of the Nissan-Infinity Parking Structure, a 10-level, 668,551-SF multi-use building. Aiming for the commercial redevelopment of the southern half of a city block, the structure houses a showroom, repair-shop, storage area and public parking. Levels five and up are reserved for private use while the levels below contain a Nissan/Infiniti automotive dealershipโ€”public parking and vehicle storage are limited to levels one and two. Due to site constraints and a Mercedes Benz building, which is adjacent to the project site, the team had to create unique design solutions under a very fast design and construction schedule. Miyamoto had originally designed a full-level deep transfer girder above the existing Mercedes building but quickly redesigned the structure to remove it during the foundation construction due to the fire rating of the existing building. Furthermore, the constraints presented a unique challenge to shoring and foundation installment, and property lines demanded offset foundations on three sides of the building.

Client

Sparc Plus, LLC.

Year

2023

Scale

668,551 Square Feet 1577 Stalls

Location

Los Angeles, CA

More Projects

Education, Sustainability

Los Angeles City College Student Union

Los Angeles, CA

Los Angeles City College (LACC) partnered with Miyamoto’s design-build team to develop a new student [..]

View Project

Tilt-Up

MDC Beaumont Bldg 1

Beaumont, CA

MDC Beaumont Bldg 1 is a 1.78-Million-SF tilt-up warehouse in Beaumont, CA. Sitting on 97.5 [..]

View Project

Transportation

Port of San Diego Earthquake Risk Assessment

San Diego, CA

Miyamoto provided a seismic risk assessment of selected Unified Port of San Diego properties located [..]

View Project

Transportation

Sacramento Regional Transit (SRT) Heavy Rail Maintenance Facility

Sacramento, CA

Miyamoto contributed to the development of design-build bridging documents for this heavy rail maintenance facility, [..]

View Project

Adaptive Reuse, Retrofit

The Beckmen YOLA Center

Inglewood, CA

The Beckmen YOLA Center is the product of Gehry Partners and Miyamoto Internationalโ€™s work to [..]

View Project

Commercial, Retrofit, Seismic Retrofit/Heritage Renovation

Urban Outfitters

Santa Monica, CA

Miyamoto provided structural engineering services for the Urban Outfitters store on Santa Monicaโ€™s Third Street [..]

View Project

Save lives, impact economies.