Nissan-Infinity Parking Structure Downtown LA

Nissan-Infinity Parking Structure Downtown LA

Miyamoto provided the structural design of the Nissan-Infinity Parking Structure, a 10-level, 668,551-SF multi-use building. Aiming for the commercial redevelopment of the southern half of a city block, the structure houses a showroom, repair-shop, storage area and public parking. Levels five and up are reserved for private use while the levels below contain a Nissan/Infiniti automotive dealership—public parking and vehicle storage are limited to levels one and two. Due to site constraints and a Mercedes Benz building, which is adjacent to the project site, the team had to create unique design solutions under a very fast design and construction schedule. Miyamoto had originally designed a full-level deep transfer girder above the existing Mercedes building but quickly redesigned the structure to remove it during the foundation construction due to the fire rating of the existing building. Furthermore, the constraints presented a unique challenge to shoring and foundation installment, and property lines demanded offset foundations on three sides of the building.

Client

Sparc Plus, LLC.

Year

2023

Scale

668,551 Square Feet 1577 Stalls

Location

Los Angeles, CA

Nissan-Infinity Parking Structure Downtown LA

Miyamoto provided the structural design of the Nissan-Infinity Parking Structure, a 10-level, 668,551-SF multi-use building. Aiming for the commercial redevelopment of the southern half of a city block, the structure houses a showroom, repair-shop, storage area and public parking. Levels five and up are reserved for private use while the levels below contain a Nissan/Infiniti automotive dealership—public parking and vehicle storage are limited to levels one and two. Due to site constraints and a Mercedes Benz building, which is adjacent to the project site, the team had to create unique design solutions under a very fast design and construction schedule. Miyamoto had originally designed a full-level deep transfer girder above the existing Mercedes building but quickly redesigned the structure to remove it during the foundation construction due to the fire rating of the existing building. Furthermore, the constraints presented a unique challenge to shoring and foundation installment, and property lines demanded offset foundations on three sides of the building.

Client

Sparc Plus, LLC.

Year

2023

Scale

668,551 Square Feet 1577 Stalls

Location

Los Angeles, CA

More Projects

Aviation

Miyamoto Earthquake Business Interruption Loss Control Program

Los Angeles

Miyamoto developed a tailored program to determine the existing risk to LAWA from earthquakes. Our [..]

View Project

CommercialEntertainment

Honda Center

Anaheim, CA

The Honda Center, previously known as the Arrowhead Pond of Anaheim, is an indoor ice [..]

View Project

Lab and Science

Millipore Sigma

Carlsbad, CA

Millipore Sigma consists of a new manufacturing facility to support viral and gene therapy production. [..]

View Project

Aviation

Regional Intermodal Transportation Center

Burbank, CA

Within the scope of the Regional Intermodal Transportation Center, Miyamoto International was responsible for designing [..]

View Project

Parking

California State University Sacramento, Parking Structure II

Sacramento, CA

California State University, Sacramento is primarily a commuter school so vertical parking structures met demand [..]

View Project

Aviation

LAX TWA Hangar

Los Angeles, CA

The structure is frequently referred to as the TWA hangar and it is located at [..]

View Project

Save lives, impact economies.