San Diego

Nissan-Infinity Parking Structure Downtown LA

Nissan-Infinity Parking Structure Downtown LA

Miyamoto provided the structural design of the Nissan-Infinity Parking Structure, a 10-level, 668,551-SF multi-use building. Aiming for the commercial redevelopment of the southern half of a city block, the structure houses a showroom, repair-shop, storage area and public parking. Levels five and up are reserved for private use while the levels below contain a Nissan/Infiniti automotive dealership—public parking and vehicle storage are limited to levels one and two. Due to site constraints and a Mercedes Benz building, which is adjacent to the project site, the team had to create unique design solutions under a very fast design and construction schedule. Miyamoto had originally designed a full-level deep transfer girder above the existing Mercedes building but quickly redesigned the structure to remove it during the foundation construction due to the fire rating of the existing building. Furthermore, the constraints presented a unique challenge to shoring and foundation installment, and property lines demanded offset foundations on three sides of the building.

Team Members

No data was found

Client

Sparc Plus, LLC.

Year

2023

Scale

668,551 Square Feet 1577 Stalls

Location

Los Angeles, CA

Nissan-Infinity Parking Structure Downtown LA

Miyamoto provided the structural design of the Nissan-Infinity Parking Structure, a 10-level, 668,551-SF multi-use building. Aiming for the commercial redevelopment of the southern half of a city block, the structure houses a showroom, repair-shop, storage area and public parking. Levels five and up are reserved for private use while the levels below contain a Nissan/Infiniti automotive dealership—public parking and vehicle storage are limited to levels one and two. Due to site constraints and a Mercedes Benz building, which is adjacent to the project site, the team had to create unique design solutions under a very fast design and construction schedule. Miyamoto had originally designed a full-level deep transfer girder above the existing Mercedes building but quickly redesigned the structure to remove it during the foundation construction due to the fire rating of the existing building. Furthermore, the constraints presented a unique challenge to shoring and foundation installment, and property lines demanded offset foundations on three sides of the building.

Client

Sparc Plus, LLC.

Year

2023

Scale

668,551 Square Feet 1577 Stalls

Location

Los Angeles, CA

More Projects

Art

Sky Mirror Sculpture

Dallas, TX

Miyamoto International was called in to construct new, as-built structural drawings for the 23-ton, 35-foot [..]

View Project

Civic

California Unity Center

Sacramento, CA

The California Unity Center is a new 3-story structure that houses a museum with space [..]

View Project

Civic

Antelope Valley Courthouse

Lancaster, CA

Highlighted by its unique barrel-shaped, three-story high atrium, the Michael D. Antonovich Courthouse is the [..]

View Project

Lab and Science

Catholic Healthcare West Burns Building

Torrance, CA

The interior space of this medical office building was completely reconfigured for new use. The [..]

View Project

Commercial

Santa Clara Towers Renovations

Santa Clara, CA

The Santa Clara Towers were due for an update. The twin eleven-story office towers were [..]

View Project

Civic, Retrofit, Seismic Retrofit/Heritage Renovation

Santa Clarita City Hall

Santa Clarita, California

The seismic retrofit of the existing 1980s, three-story Santa Clarita City Hall included the installation [..]

View Project

Save lives, impact economies.

what we’re up to

Latest News & Updates

Subscribe to learn about new the latest in engineering news, solutions, and updates.

We care about your data in our privacy policy.